Excavation design construction method for four-arch tunnel

The invention discloses an excavation design construction method for a four-arch tunnel. The excavation design construction method comprises the steps that S101, a middle pilot tunnel is excavated, and a corresponding middle partition wall is constructed; s102, an upper step of the right main hole a...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: HE YING, HUANG XIN, ZHANG ZHAOYUAN, CAO FENG, WAN ZHIWEN, WANG HAILIN, XIE YEZHEN, ZHAO HUIXIONG, YIN JUNTAO, YANG XIONG, CAI LIQIN, TAN SHIHAO, BAI SHU, JIANG SHENGBO, CHEN XI, JING HUAIJUN, HU JIUXIAN, WANG JIANHUA, MA JUNQIU, ZHOU JINQIANG, HU HUIHUA, LU WUZHONG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses an excavation design construction method for a four-arch tunnel. The excavation design construction method comprises the steps that S101, a middle pilot tunnel is excavated, and a corresponding middle partition wall is constructed; s102, an upper step of the right main hole and an upper step of the left main hole are excavated, and a first layer of primary support is constructed; s103, excavating a lower middle step of the right main hole and a lower middle step of the left main hole, and performing secondary lining of the left main hole after a second layer of primary support is constructed; s104, a right auxiliary road right pilot tunnel primary support and a right auxiliary road right tunnel bottom primary support are constructed; constructing a left auxiliary road left pilot tunnel primary support and a left auxiliary road left tunnel bottom primary support; s105, a right auxiliary road arch part primary support, a right auxiliary road left tunnel bottom primary support and a right