Construction process of novel counterfort retaining wall
The invention relates to a construction process of a novel counterfort retaining wall, which is arranged at concrete retaining wall toes on two side parts of an existing road shoulder of a steel rail piece, and is of a stepped structure. Ditching at the bottom of the outer side of the toe of the con...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | WANG DONGLI WANG JING BAI XINRONG NIU ZENGJIAN CHEN SHULI |
description | The invention relates to a construction process of a novel counterfort retaining wall, which is arranged at concrete retaining wall toes on two side parts of an existing road shoulder of a steel rail piece, and is of a stepped structure. Ditching at the bottom of the outer side of the toe of the concrete retaining wall and placing the bottom of the buttress; gravel soil layers are filled and tamped on the upper surfaces and the bottoms of the bottoms of the buttress pieces; a backfill earth-rock layer is placed between the vertical wall of the buttress piece and the toe of the concrete retaining wall; drain holes are respectively formed in the backfill soil and stone layer and the vertical wall of the buttress piece; a reinforcing steel bar assembly in the wall body is arranged in the backfill soil and stone layer and is in lap joint with reinforcing steel bars of the buttress pieces; the device is reasonable in design, compact in structure and convenient to use.
本发明涉及新型扶壁式挡墙的施工工艺,其设置在钢轨件的既有路肩两侧部的混凝土挡墙墙趾,其为台阶 |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN114108691A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN114108691A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN114108691A3</originalsourceid><addsrcrecordid>eNrjZLBwzs8rLikqTS7JzM9TKCjKT04tLlbIT1PIyy9LzVFIzi_NK0ktSssvKlEoSi1JzMzLzEtXKE_MyeFhYE1LzClO5YXS3AyKbq4hzh66qQX58anFBYnJqXmpJfHOfoaGJoYGFmaWho7GxKgBAGarLww</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Construction process of novel counterfort retaining wall</title><source>esp@cenet</source><creator>WANG DONGLI ; WANG JING ; BAI XINRONG ; NIU ZENGJIAN ; CHEN SHULI</creator><creatorcontrib>WANG DONGLI ; WANG JING ; BAI XINRONG ; NIU ZENGJIAN ; CHEN SHULI</creatorcontrib><description>The invention relates to a construction process of a novel counterfort retaining wall, which is arranged at concrete retaining wall toes on two side parts of an existing road shoulder of a steel rail piece, and is of a stepped structure. Ditching at the bottom of the outer side of the toe of the concrete retaining wall and placing the bottom of the buttress; gravel soil layers are filled and tamped on the upper surfaces and the bottoms of the bottoms of the buttress pieces; a backfill earth-rock layer is placed between the vertical wall of the buttress piece and the toe of the concrete retaining wall; drain holes are respectively formed in the backfill soil and stone layer and the vertical wall of the buttress piece; a reinforcing steel bar assembly in the wall body is arranged in the backfill soil and stone layer and is in lap joint with reinforcing steel bars of the buttress pieces; the device is reasonable in design, compact in structure and convenient to use.
本发明涉及新型扶壁式挡墙的施工工艺,其设置在钢轨件的既有路肩两侧部的混凝土挡墙墙趾,其为台阶</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220301&DB=EPODOC&CC=CN&NR=114108691A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220301&DB=EPODOC&CC=CN&NR=114108691A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WANG DONGLI</creatorcontrib><creatorcontrib>WANG JING</creatorcontrib><creatorcontrib>BAI XINRONG</creatorcontrib><creatorcontrib>NIU ZENGJIAN</creatorcontrib><creatorcontrib>CHEN SHULI</creatorcontrib><title>Construction process of novel counterfort retaining wall</title><description>The invention relates to a construction process of a novel counterfort retaining wall, which is arranged at concrete retaining wall toes on two side parts of an existing road shoulder of a steel rail piece, and is of a stepped structure. Ditching at the bottom of the outer side of the toe of the concrete retaining wall and placing the bottom of the buttress; gravel soil layers are filled and tamped on the upper surfaces and the bottoms of the bottoms of the buttress pieces; a backfill earth-rock layer is placed between the vertical wall of the buttress piece and the toe of the concrete retaining wall; drain holes are respectively formed in the backfill soil and stone layer and the vertical wall of the buttress piece; a reinforcing steel bar assembly in the wall body is arranged in the backfill soil and stone layer and is in lap joint with reinforcing steel bars of the buttress pieces; the device is reasonable in design, compact in structure and convenient to use.
本发明涉及新型扶壁式挡墙的施工工艺,其设置在钢轨件的既有路肩两侧部的混凝土挡墙墙趾,其为台阶</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLBwzs8rLikqTS7JzM9TKCjKT04tLlbIT1PIyy9LzVFIzi_NK0ktSssvKlEoSi1JzMzLzEtXKE_MyeFhYE1LzClO5YXS3AyKbq4hzh66qQX58anFBYnJqXmpJfHOfoaGJoYGFmaWho7GxKgBAGarLww</recordid><startdate>20220301</startdate><enddate>20220301</enddate><creator>WANG DONGLI</creator><creator>WANG JING</creator><creator>BAI XINRONG</creator><creator>NIU ZENGJIAN</creator><creator>CHEN SHULI</creator><scope>EVB</scope></search><sort><creationdate>20220301</creationdate><title>Construction process of novel counterfort retaining wall</title><author>WANG DONGLI ; WANG JING ; BAI XINRONG ; NIU ZENGJIAN ; CHEN SHULI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN114108691A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>WANG DONGLI</creatorcontrib><creatorcontrib>WANG JING</creatorcontrib><creatorcontrib>BAI XINRONG</creatorcontrib><creatorcontrib>NIU ZENGJIAN</creatorcontrib><creatorcontrib>CHEN SHULI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WANG DONGLI</au><au>WANG JING</au><au>BAI XINRONG</au><au>NIU ZENGJIAN</au><au>CHEN SHULI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Construction process of novel counterfort retaining wall</title><date>2022-03-01</date><risdate>2022</risdate><abstract>The invention relates to a construction process of a novel counterfort retaining wall, which is arranged at concrete retaining wall toes on two side parts of an existing road shoulder of a steel rail piece, and is of a stepped structure. Ditching at the bottom of the outer side of the toe of the concrete retaining wall and placing the bottom of the buttress; gravel soil layers are filled and tamped on the upper surfaces and the bottoms of the bottoms of the buttress pieces; a backfill earth-rock layer is placed between the vertical wall of the buttress piece and the toe of the concrete retaining wall; drain holes are respectively formed in the backfill soil and stone layer and the vertical wall of the buttress piece; a reinforcing steel bar assembly in the wall body is arranged in the backfill soil and stone layer and is in lap joint with reinforcing steel bars of the buttress pieces; the device is reasonable in design, compact in structure and convenient to use.
本发明涉及新型扶壁式挡墙的施工工艺,其设置在钢轨件的既有路肩两侧部的混凝土挡墙墙趾,其为台阶</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN114108691A |
source | esp@cenet |
subjects | EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FOUNDATIONS HYDRAULIC ENGINEERING SOIL SHIFTING UNDERGROUND OR UNDERWATER STRUCTURES |
title | Construction process of novel counterfort retaining wall |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-06T11%3A59%3A56IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WANG%20DONGLI&rft.date=2022-03-01&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN114108691A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |