Construction process of novel counterfort retaining wall

The invention relates to a construction process of a novel counterfort retaining wall, which is arranged at concrete retaining wall toes on two side parts of an existing road shoulder of a steel rail piece, and is of a stepped structure. Ditching at the bottom of the outer side of the toe of the con...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WANG DONGLI, WANG JING, BAI XINRONG, NIU ZENGJIAN, CHEN SHULI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention relates to a construction process of a novel counterfort retaining wall, which is arranged at concrete retaining wall toes on two side parts of an existing road shoulder of a steel rail piece, and is of a stepped structure. Ditching at the bottom of the outer side of the toe of the concrete retaining wall and placing the bottom of the buttress; gravel soil layers are filled and tamped on the upper surfaces and the bottoms of the bottoms of the buttress pieces; a backfill earth-rock layer is placed between the vertical wall of the buttress piece and the toe of the concrete retaining wall; drain holes are respectively formed in the backfill soil and stone layer and the vertical wall of the buttress piece; a reinforcing steel bar assembly in the wall body is arranged in the backfill soil and stone layer and is in lap joint with reinforcing steel bars of the buttress pieces; the device is reasonable in design, compact in structure and convenient to use. 本发明涉及新型扶壁式挡墙的施工工艺,其设置在钢轨件的既有路肩两侧部的混凝土挡墙墙趾,其为台阶