Grouting repair method for settlement of power tower foundation

A grouting repair method for settlement of a power tower foundation comprises the following steps that S1, calculated explosive with the safe dosage is packaged into an explosive package in advance for standby application; S2, a drilling device is used for drilling holes downwards in an inclined mod...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LIANG FENGKAI, WANG JIANFENG, CHEN ERTAO, LONG TENGYUN, ZHANG XIAOHUI, LIU HUIXIA
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:A grouting repair method for settlement of a power tower foundation comprises the following steps that S1, calculated explosive with the safe dosage is packaged into an explosive package in advance for standby application; S2, a drilling device is used for drilling holes downwards in an inclined mode from multiple different directions of the ground position of the power tower foundation, the bottom ends of the holes are made to be located under the power tower foundation, and the drilling device is taken out; S3, blasting charges are placed in different positions in the drill hole for blasting, the blasting source expands and explodes to generate continuous blasting shock waves, and the soil is properly loosened and fractured in a large range; and S4, a grouting pipe is inserted into the exploded fluffy soil, grouting is conducted, after grout is hardened, a soil layer of the power tower foundation is reinforced and repaired, and the foundation is prevented from continuing to settle. The micro-explosion metho