Land short pier bridge roadbed filling type bridge climbing channel and construction method thereof
The invention belongs to the related technical field of bridge construction, and discloses a land short pier bridge roadbed filling type bridge climbing channel which is designed at a land short pier of a bridge in construction and sequentially comprises a climbing lane, a turning platform, a tempor...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention belongs to the related technical field of bridge construction, and discloses a land short pier bridge roadbed filling type bridge climbing channel which is designed at a land short pier of a bridge in construction and sequentially comprises a climbing lane, a turning platform, a temporary bridge abutment and a temporary steel bridge in the passing direction. In addition, the roadbed of the upper bridge channel is filled with filler in a layered mode, then the temporary bridge abutment is arranged at the highest point of the roadbed, and the temporary steel bridge is arranged between the temporary bridge abutment and the top of the beam face of the bridge in construction to achieve transition. The invention further discloses a corresponding construction method. According to the land short pier bridge roadbed filling type bridge climbing channel, while the material transportation distance is shortened, the material transportation efficiency is obviously improved, and meanwhile, the device has the |
---|