Rail transit construction scheduling management system and method based on drawing board analysis and medium
The invention provides a rail transit construction scheduling management system and method based on drawing board analysis and a medium, and the method comprises the steps: defining a global variable of a drawing board in parameter configuration as a drawing board parameter, and assigning a value to...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention provides a rail transit construction scheduling management system and method based on drawing board analysis and a medium, and the method comprises the steps: defining a global variable of a drawing board in parameter configuration as a drawing board parameter, and assigning a value to the global variable; in drawing board analysis, according to service attribute data and the drawing board parameter, enabling a rail-mounted area and a power supply area to form a rectangular box, separately analyzing the line area data of the rail-mounted area and the power supply area, generating SVG graphs connected end to end, and displaying the SVG graphs on the drawing board; configuring the state attribute data of the rail-mounted area and the power supply area in attribute configuration; drawing construction plans in the drawing board, selecting a construction area and the power supply area according to the construction plans, generating area description according to a semantic analysis rule, displaying a |
---|