Hoisting construction method for pipe gallery steel members

The invention discloses a hoisting construction method for pipe gallery steel members. The hoisting construction method comprises the following operation steps of S1, preparation before hoisting, specifically, the steel members being transported, packaged, transported, loaded, unloaded and stacked;...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHANG ZIHAO, GUO ZHENZHI, LIU YIFEI, WANG TONG, PENG RUI, HOU YONGPENG, GU XIAODONG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a hoisting construction method for pipe gallery steel members. The hoisting construction method comprises the following operation steps of S1, preparation before hoisting, specifically, the steel members being transported, packaged, transported, loaded, unloaded and stacked; S2, the steel members entering a field for inspection, measurement and reinspection; S3, performing steel structure mounting preparation work, specifically, construction site preparation; equipment selection; S4, performing basic steps of steel structure hoisting and hoisting, specifically, trial hoisting and hoisting in place; and S5, steel platform hoisting, and performing mounting and welding on site, specifically, selecting a welding method, selecting a welding material, storing and keeping the welding material, generally stipulating about welding, checking before welding, cleaning before welding, positioned welding, welding a run-on plate, a lead-out plate and a welding lining plate, and meeting the requiremen