Pre-embedded connecting piece anchoring performance drawing detector and construction method thereof
The invention discloses a pre-embedded connecting piece anchoring performance drawing detector and a construction method thereof. The detector comprises an embedded part connected to a precast concrete slab, a clamp assembly connected to the extending end of the upper portion of the embedded part, a...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a pre-embedded connecting piece anchoring performance drawing detector and a construction method thereof. The detector comprises an embedded part connected to a precast concrete slab, a clamp assembly connected to the extending end of the upper portion of the embedded part, a counter-force base fixedly connected with the clamp assembly, a drawing connecting part connected with the extending end, extending out of the top of the counter-force base, of the clamp assembly, a connecting line connected with the drawing connecting part, a detection meter connected to the extending end of the connecting line, and a detection loading part. Through the arrangement of the clamp assembly, the clamp assembly is used for connecting the plate-shaped embedded parts, and the clamp part can be correspondingly connected and replaced corresponding to different embedded parts; through the arrangement of the counter-force base, the counter-force required during loading and the installation of the clamp asse |
---|