quick construction method for cement soil filling

The invention discloses a quick construction method for cement soil filling, and belongs to the technical field of roadbed construction. A quick construction method for cement soil filling comprises the following steps that S01, soil materials are transported, namely the soil materials are transport...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZENG LUO, WANG XIN, GAO WEI, LAI JIANGMING, LI YANGCHUN, CAO JILONG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a quick construction method for cement soil filling, and belongs to the technical field of roadbed construction. A quick construction method for cement soil filling comprises the following steps that S01, soil materials are transported, namely the soil materials are transported to a working face; s02, flattening is performed, namely a hydraulic backhoe is adopted to quickly and roughly flatten the the soil materials; s03, cement is laid, specifically, cement is laid on the soil according to the proportion; s04, stirring is conducted by adopting a rotating cultivator until the soil and the cement are uniformly mixed; and S05, rolling is conducted, specifically, a vibration roller is adopted for rolling. According to the construction method, the steps are reasonably planned, corresponding equipment is matched, the operation method capable of realizing quick circulation is formed, the construction process is refined, the construction quality is improved, and the labor intensity is reduced