BIM -based prefabricated part hoisting visual management system

The embodiment of the invention discloses a BIM -based prefabricated part hoisting visual management system. The system comprises an information acquisition module, a building information model management and control platform and a visualization module, the information acquisition module is used for...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LI ZHENGDAO, ZHEN YU, KOU LIFU, BAO XIAOHUA, SUN LIFENG, XING HOUBING, LI XIAO, ZHAO YIN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The embodiment of the invention discloses a BIM -based prefabricated part hoisting visual management system. The system comprises an information acquisition module, a building information model management and control platform and a visualization module, the information acquisition module is used for acquiring real-time space information of a prefabricated part and sending the real-time space information to the building information model management and control platform in the hoisting process of the prefabricated part; the building information model management and control platform is used for constructing a hoisting process 4D real-time model of the prefabricated part according to the real-time space information of the prefabricated part and sending the hoisting process 4D real-time model to the visualization module; and the visualization module is used for displaying a hoisting process 4D real-time model of the prefabricated part. According to the embodiment of the invention, the whole hoisting process of the