Strand pulling construction monitoring method for steel strand in corrugated pipe of prestressed structure

The invention provides a strand pulling construction monitoring method for a steel strand in a corrugated pipe of a prestressed structure. The method comprises the following steps: S1, arranging a wireless probe on the steel strand, and continuously detecting the contact part of the steel strand and...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LIANG JIAWEI, TANG XIAOJUN, CHANG LIANG, LI YUANTAO, LIU SONGCHUN, CHENG WEI, DING ZHAOXI, SU YANYOU, ZHANG HAICHUN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention provides a strand pulling construction monitoring method for a steel strand in a corrugated pipe of a prestressed structure. The method comprises the following steps: S1, arranging a wireless probe on the steel strand, and continuously detecting the contact part of the steel strand and the corrugated pipe in the moving process by using the wireless probe; S2, placing the steel strand in a cable penetrating machine, and using the cable penetrating machine to stabilize the steel strand; S3, enabling that a central processing unit is in data connection with the cable penetrating machine, and the central processing unit is in data connection with the wireless probe; S4, driving the steel strand to penetrate through the corrugated pipe by using the cable penetrating machine, and reading detection data of the wireless probe in real time by using the central processing unit; and S5, according to the data detected by the wireless probe, adjusting the steel strand pulling speed of the cable penetrating m