The invention discloses a prefabrication method of a 40m simply-supported box girder. The prefabrication method comprises the following steps: steel bar engineering construction: processing, binding and hoisting steel bars; form board mounting: mounting a bottom form, a side form, an inner form and...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: QIU ZI, LYU MAOSHENG, ZHANG BO, CAO WANHUI, LI ZEHUI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a prefabrication method of a 40m simply-supported box girder. The prefabrication method comprises the following steps: steel bar engineering construction: processing, binding and hoisting steel bars; form board mounting: mounting a bottom form, a side form, an inner form and an end form; concrete engineering construction: pouring and curing concrete; and pre-stress engineering construction: pulling out a rubber pipe, finished steel strand bundle penetrating-in, tensioning, press grouting, sealing anchor and painting a beam-end waterproof coating. The technical problems that the construction cost is high, the risk is high, and the application range of the high-speed railway is not large are solved. 本申请公开了一种40m简支箱梁的预制方法。该预制方法包括:钢筋工程施工:钢筋的加工、绑扎和吊装;安装模板:底模、侧模、内模、端模的安装;混凝土工程施工:混凝土的灌注和养护;预应力工程施工:抽拔橡胶管、成品钢绞线束、张拉、压浆、封锚和涂刷梁端防水涂料;本申请解决了施工成本、风险大,且对高速铁路的适用范围不大的技术问题。