Prefabricating method of 40m simply-supported box girder
The invention discloses a prefabrication method of a 40m simply-supported box girder. The prefabrication method comprises the following steps: steel bar engineering construction: processing, binding and hoisting steel bars; form board mounting: mounting a bottom form, a side form, an inner form and...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a prefabrication method of a 40m simply-supported box girder. The prefabrication method comprises the following steps: steel bar engineering construction: processing, binding and hoisting steel bars; form board mounting: mounting a bottom form, a side form, an inner form and an end form; concrete engineering construction: pouring and curing concrete; and pre-stress engineering construction: pulling out a rubber pipe, finished steel strand bundle penetrating-in, tensioning, press grouting, sealing anchor and painting a beam-end waterproof coating. The technical problems that the construction cost is high, the risk is high, and the application range of the high-speed railway is not large are solved.
本申请公开了一种40m简支箱梁的预制方法。该预制方法包括:钢筋工程施工:钢筋的加工、绑扎和吊装;安装模板:底模、侧模、内模、端模的安装;混凝土工程施工:混凝土的灌注和养护;预应力工程施工:抽拔橡胶管、成品钢绞线束、张拉、压浆、封锚和涂刷梁端防水涂料;本申请解决了施工成本、风险大,且对高速铁路的适用范围不大的技术问题。 |
---|