Construction method for improving embankment filler weak expansive soil lime

The invention discloses a construction method for improving embankment filler weak expansive soil lime. The construction method comprises the following steps: 1, testing the proportion of lime-improved weak expansive soil; 2, checking parameters such as longitudinal fracture elevation of a lower bea...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LI CHAO, YU DONGDONG, ZHAO KAOSHENG, FANG QIPAN, YU QIN, ZHAO FENGZHANG, WANG CHENGDONG, HONG PUPU, JI HAOBIN, HU CHENPING, MIAO ZHIYONG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a construction method for improving embankment filler weak expansive soil lime. The construction method comprises the following steps: 1, testing the proportion of lime-improved weak expansive soil; 2, checking parameters such as longitudinal fracture elevation of a lower bearing layer to meet construction conditions; 3, performing quick lime digestion; 4, transporting the weak expansive soil to a construction site, and after filling of the weak expansive soil is completed, adopting a bulldozer for rough levelling and elevation measurement; 5, performing ash spreading by using a traction type full-automatic ash spreading truck, and controlling the spreading quantity of the lime by using a numerical control high-precision flow regulating valve; 6, actually measuring the water content of the filler, and adjusting the actually measured water content to be 1-2% higher than the optimal water content; 7, mixing by adopting a regenerator, wherein the mixing depth is controlled by adopting a m