Steel plate composite beam bridge deck slab wet joint construction method
The invention provides a steel plate composite beam bridge deck slab wet joint construction method which comprises the steps that (1) a first prefabricated section bottom die is installed, a first prefabricated section is poured, one end of the first prefabricated section bottom die is a fixed botto...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention provides a steel plate composite beam bridge deck slab wet joint construction method which comprises the steps that (1) a first prefabricated section bottom die is installed, a first prefabricated section is poured, one end of the first prefabricated section bottom die is a fixed bottom die, and the other end of the first prefabricated section bottom die is a movable bottom die; (2) the movable bottom die of the first prefabricated section is detached, and the poured first prefabricated section and the first prefabricated section bottom die are integrally and horizontally moved to the matched position; (3) a second prefabricated section bottom die to be poured is installed, and the second prefabricated section bottom die and the first prefabricated section bottom die are the same in structure; (4) the bottom supporting plate of the first prefabricated section is in lap joint with the fixed bottom die of the second prefabricated section, and concrete is poured; (5) the second prefabricated sectio |
---|