Steel plate composite beam bridge deck slab wet joint construction method

The invention provides a steel plate composite beam bridge deck slab wet joint construction method which comprises the steps that (1) a first prefabricated section bottom die is installed, a first prefabricated section is poured, one end of the first prefabricated section bottom die is a fixed botto...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHANG QI, QIN FUJIN, SUN YANMING, GAN XIAOJIANG, YUAN ZHU, YANG YONG, LIAO HUAJIAN, ZHANG DIDI, GU JIANGHUI, TAO BEN, LENG DAWEI, MA ZUQIAO, ZHAI FULONG, LIAO PINFU
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention provides a steel plate composite beam bridge deck slab wet joint construction method which comprises the steps that (1) a first prefabricated section bottom die is installed, a first prefabricated section is poured, one end of the first prefabricated section bottom die is a fixed bottom die, and the other end of the first prefabricated section bottom die is a movable bottom die; (2) the movable bottom die of the first prefabricated section is detached, and the poured first prefabricated section and the first prefabricated section bottom die are integrally and horizontally moved to the matched position; (3) a second prefabricated section bottom die to be poured is installed, and the second prefabricated section bottom die and the first prefabricated section bottom die are the same in structure; (4) the bottom supporting plate of the first prefabricated section is in lap joint with the fixed bottom die of the second prefabricated section, and concrete is poured; (5) the second prefabricated sectio