Grading hole-forming construction method for rotary excavating cast-in-place pile

The invention discloses a grading hole-forming construction method for a rotary excavating cast-in-place pile. The grading hole-forming construction method comprises the following steps that a pile casing is buried, the inner diameter of the pile casing is larger than the designed hole diameter of a...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHAO HENGYANG, CHE MINGSHENG, CHEN JIANLIN, WANG HAOYU, WANG GANG, HUANG JIANYONG, YU XIAOYI, MA PEIXUAN, WEN SHAOTONG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator ZHAO HENGYANG
CHE MINGSHENG
CHEN JIANLIN
WANG HAOYU
WANG GANG
HUANG JIANYONG
YU XIAOYI
MA PEIXUAN
WEN SHAOTONG
description The invention discloses a grading hole-forming construction method for a rotary excavating cast-in-place pile. The grading hole-forming construction method comprises the following steps that a pile casing is buried, the inner diameter of the pile casing is larger than the designed hole diameter of a rotary excavating cast-in-place pile hole, and the upper end face of the pile casing is higher than the ground; a rotary drilling machine is used for taking soil in the pile casing to form a hole, and the hole diameter is gradually enlarged through multiple times of soil taking till the designed hole diameter is achieved; and disintegrating slag in the rotary excavating cast-in-place pile hole is cleared away. According to the grading hole-forming construction method for the rotary excavating cast-in-place pile, the requirements for the power and the torque of the rotary excavating machine can be reduced, and the equipment cost can be reduced. 本发明公开了一种旋挖灌注桩分级成孔施工方法,包括以下步骤:埋设护筒,护筒的内径大于旋挖灌注桩孔的设计孔径,护筒的上端面高于地面;利用旋挖机在护
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN113404044A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN113404044A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN113404044A3</originalsourceid><addsrcrecordid>eNrjZAh0L0pMycxLV8jIz0nVTcsvygVxkvPzikuKSpNLMvPzFHJTSzLyUxSAcgpF-SWJRZUKqRXJiWWJJWCVicUlupl5ugU5icmpCgWZOak8DKxpiTnFqbxQmptB0c01xNlDN7UgPz61uACoLi-1JN7Zz9DQ2MQACE0cjYlRAwAKbTfu</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Grading hole-forming construction method for rotary excavating cast-in-place pile</title><source>esp@cenet</source><creator>ZHAO HENGYANG ; CHE MINGSHENG ; CHEN JIANLIN ; WANG HAOYU ; WANG GANG ; HUANG JIANYONG ; YU XIAOYI ; MA PEIXUAN ; WEN SHAOTONG</creator><creatorcontrib>ZHAO HENGYANG ; CHE MINGSHENG ; CHEN JIANLIN ; WANG HAOYU ; WANG GANG ; HUANG JIANYONG ; YU XIAOYI ; MA PEIXUAN ; WEN SHAOTONG</creatorcontrib><description>The invention discloses a grading hole-forming construction method for a rotary excavating cast-in-place pile. The grading hole-forming construction method comprises the following steps that a pile casing is buried, the inner diameter of the pile casing is larger than the designed hole diameter of a rotary excavating cast-in-place pile hole, and the upper end face of the pile casing is higher than the ground; a rotary drilling machine is used for taking soil in the pile casing to form a hole, and the hole diameter is gradually enlarged through multiple times of soil taking till the designed hole diameter is achieved; and disintegrating slag in the rotary excavating cast-in-place pile hole is cleared away. According to the grading hole-forming construction method for the rotary excavating cast-in-place pile, the requirements for the power and the torque of the rotary excavating machine can be reduced, and the equipment cost can be reduced. 本发明公开了一种旋挖灌注桩分级成孔施工方法,包括以下步骤:埋设护筒,护筒的内径大于旋挖灌注桩孔的设计孔径,护筒的上端面高于地面;利用旋挖机在护</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2021</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20210917&amp;DB=EPODOC&amp;CC=CN&amp;NR=113404044A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,309,781,886,25566,76549</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20210917&amp;DB=EPODOC&amp;CC=CN&amp;NR=113404044A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHAO HENGYANG</creatorcontrib><creatorcontrib>CHE MINGSHENG</creatorcontrib><creatorcontrib>CHEN JIANLIN</creatorcontrib><creatorcontrib>WANG HAOYU</creatorcontrib><creatorcontrib>WANG GANG</creatorcontrib><creatorcontrib>HUANG JIANYONG</creatorcontrib><creatorcontrib>YU XIAOYI</creatorcontrib><creatorcontrib>MA PEIXUAN</creatorcontrib><creatorcontrib>WEN SHAOTONG</creatorcontrib><title>Grading hole-forming construction method for rotary excavating cast-in-place pile</title><description>The invention discloses a grading hole-forming construction method for a rotary excavating cast-in-place pile. The grading hole-forming construction method comprises the following steps that a pile casing is buried, the inner diameter of the pile casing is larger than the designed hole diameter of a rotary excavating cast-in-place pile hole, and the upper end face of the pile casing is higher than the ground; a rotary drilling machine is used for taking soil in the pile casing to form a hole, and the hole diameter is gradually enlarged through multiple times of soil taking till the designed hole diameter is achieved; and disintegrating slag in the rotary excavating cast-in-place pile hole is cleared away. According to the grading hole-forming construction method for the rotary excavating cast-in-place pile, the requirements for the power and the torque of the rotary excavating machine can be reduced, and the equipment cost can be reduced. 本发明公开了一种旋挖灌注桩分级成孔施工方法,包括以下步骤:埋设护筒,护筒的内径大于旋挖灌注桩孔的设计孔径,护筒的上端面高于地面;利用旋挖机在护</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2021</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZAh0L0pMycxLV8jIz0nVTcsvygVxkvPzikuKSpNLMvPzFHJTSzLyUxSAcgpF-SWJRZUKqRXJiWWJJWCVicUlupl5ugU5icmpCgWZOak8DKxpiTnFqbxQmptB0c01xNlDN7UgPz61uACoLi-1JN7Zz9DQ2MQACE0cjYlRAwAKbTfu</recordid><startdate>20210917</startdate><enddate>20210917</enddate><creator>ZHAO HENGYANG</creator><creator>CHE MINGSHENG</creator><creator>CHEN JIANLIN</creator><creator>WANG HAOYU</creator><creator>WANG GANG</creator><creator>HUANG JIANYONG</creator><creator>YU XIAOYI</creator><creator>MA PEIXUAN</creator><creator>WEN SHAOTONG</creator><scope>EVB</scope></search><sort><creationdate>20210917</creationdate><title>Grading hole-forming construction method for rotary excavating cast-in-place pile</title><author>ZHAO HENGYANG ; CHE MINGSHENG ; CHEN JIANLIN ; WANG HAOYU ; WANG GANG ; HUANG JIANYONG ; YU XIAOYI ; MA PEIXUAN ; WEN SHAOTONG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN113404044A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2021</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHAO HENGYANG</creatorcontrib><creatorcontrib>CHE MINGSHENG</creatorcontrib><creatorcontrib>CHEN JIANLIN</creatorcontrib><creatorcontrib>WANG HAOYU</creatorcontrib><creatorcontrib>WANG GANG</creatorcontrib><creatorcontrib>HUANG JIANYONG</creatorcontrib><creatorcontrib>YU XIAOYI</creatorcontrib><creatorcontrib>MA PEIXUAN</creatorcontrib><creatorcontrib>WEN SHAOTONG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHAO HENGYANG</au><au>CHE MINGSHENG</au><au>CHEN JIANLIN</au><au>WANG HAOYU</au><au>WANG GANG</au><au>HUANG JIANYONG</au><au>YU XIAOYI</au><au>MA PEIXUAN</au><au>WEN SHAOTONG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Grading hole-forming construction method for rotary excavating cast-in-place pile</title><date>2021-09-17</date><risdate>2021</risdate><abstract>The invention discloses a grading hole-forming construction method for a rotary excavating cast-in-place pile. The grading hole-forming construction method comprises the following steps that a pile casing is buried, the inner diameter of the pile casing is larger than the designed hole diameter of a rotary excavating cast-in-place pile hole, and the upper end face of the pile casing is higher than the ground; a rotary drilling machine is used for taking soil in the pile casing to form a hole, and the hole diameter is gradually enlarged through multiple times of soil taking till the designed hole diameter is achieved; and disintegrating slag in the rotary excavating cast-in-place pile hole is cleared away. According to the grading hole-forming construction method for the rotary excavating cast-in-place pile, the requirements for the power and the torque of the rotary excavating machine can be reduced, and the equipment cost can be reduced. 本发明公开了一种旋挖灌注桩分级成孔施工方法,包括以下步骤:埋设护筒,护筒的内径大于旋挖灌注桩孔的设计孔径,护筒的上端面高于地面;利用旋挖机在护</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN113404044A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Grading hole-forming construction method for rotary excavating cast-in-place pile
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-17T20%3A52%3A42IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHAO%20HENGYANG&rft.date=2021-09-17&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN113404044A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true