Building vibration isolation foundation construction method

The invention relates to the technical field of building construction, in particular to a building vibration isolation foundation construction method. The method comprises the following steps that S1, a foundation embedded part is optimized and manufactured; on-site preparation and paying off are ca...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: CAO HUI, WANG TAO, TIAN WENMAO, FAN HUA, WANG KEXIN, WEI JUN, SUN XUESHUANG, LU XIAOPENG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention relates to the technical field of building construction, in particular to a building vibration isolation foundation construction method. The method comprises the following steps that S1, a foundation embedded part is optimized and manufactured; on-site preparation and paying off are carried out; a lower buttress is bound with a formwork; first-time pouring and fixing frame mounting are carried out; an embedded part is mounted; Second-time pouring concrete, third-time pouring and fourth-time pouring are carried out; a vibration isolator is mounted; an upper buttress is constructed; and checking and accepting are carried out. According to the construction method, the vibration isolator and the buttresses are integrally connected, so that the high-precision requirement of the plane position of the vibration isolator is met, the working procedures are detailed and perfect, the vibration isolation construction efficiency is remarkably improved, and the construction quality is guaranteed. The construc