Integrated tunnel pilot tunnel for realizing forward deslagging, ventilation, escape and exploration, and method

The invention discloses an integrated tunnel pilot tunnel for realizing forward deslagging, ventilation, escape and exploration, and a method. The integrated tunnel pilot tunnel comprises an advance tunnel, wherein the advance tunnel is horizontally arranged; the advance tunnel communicates with a v...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: MAO HUABING, ZHANG RUI, ZHENG ZHAOYI, WANG DONGMING, GE FENGYUAN, ZHANG WEN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses an integrated tunnel pilot tunnel for realizing forward deslagging, ventilation, escape and exploration, and a method. The integrated tunnel pilot tunnel comprises an advance tunnel, wherein the advance tunnel is horizontally arranged; the advance tunnel communicates with a vertical shaft; rails are laid at the bottom of the advance tunnel; a transportation mine car is arranged on the rails; a protection structure is arranged at a hole opening of the advance tunnel; and jet fans are arranged in the advance tunnel and the vertical shaft. 本发明公开了一种实现正向出渣通风逃生勘探的一体化隧道导洞及方法,包括超前隧道,超前隧道水平布置,且超前隧道和竖井相连通;所述超前隧道底部铺设轨道,运输矿车安设于轨道,超前隧道的洞口设置防护结构,且超前隧道和竖井内均设置射流风机。