Oil well cable-controlled layering monitoring and intelligent production allocation system and using method thereof
The invention provides an oil well cable-controlled layering monitoring and intelligent production allocation system and a using method thereof. The oil well cable-controlled layering monitoring and intelligent production allocation system comprises layering production sliding sleeves, a ground anti...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention provides an oil well cable-controlled layering monitoring and intelligent production allocation system and a using method thereof. The oil well cable-controlled layering monitoring and intelligent production allocation system comprises layering production sliding sleeves, a ground anti-explosion control box, cable passing packers and a control cable, the layering production sliding sleeves and the cable passing packers are arranged at intervals, the cable passing packers pack the layering production sliding sleeves into respective layer sections so as to achieve the layering purpose, and the layering production sliding sleeves are connected with the ground anti-explosion control box through the control cable. According to the oil well cable-controlled layering monitoring and intelligent production allocation system, underground liquid flow data can be monitored and stored regularly, the cable-controlled intelligent production sliding sleeves have the biggest characteristic of a double-flowmeter, |
---|