Construction equipment and method for hanging, integrally splicing and integrally lifting building vertical formwork

The invention relates to construction equipment and method for hanging, integrally splicing and integrally lifting a building vertical formwork. The construction equipment is used for being installed on a steel platform of a building machine, and comprises an I-shaped steel hanging head, I-shaped st...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: QI PEI, LI TONG, DING WEIXIANG, ZHOU HONGWEI, ZOU JINDUN, FENG WEI, LIU MINKANG, PAN DAWEI, WANG YIHAN, LYU WENZHI, WANG WEI, ZHANG ZHIHUA, GONG WENTAO, ZHANG BUYUE, ZHOU PENGCHENG, ZHANG PENG, LIU HANWEN, WEI XIAOMING, QIAN SHIQING, XU GUOWEI, WANG JIFENG, ZHANG SHENGNENG, LIU HENG, WAN DEHAI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention relates to construction equipment and method for hanging, integrally splicing and integrally lifting a building vertical formwork. The construction equipment is used for being installed on a steel platform of a building machine, and comprises an I-shaped steel hanging head, I-shaped steel, a pulley hanging point, a turn buckle, a hanging rod and a U-shaped clamping ring; and the I-shaped steel is arranged at any position of the steel platform through the I-shaped steel hanging head; the pulley lifting point is arranged on the I-shaped steel and connected with the hanging rod through the turn buckle, and the U-shaped clamping ring is arranged at the tail end of the hanging rod and used for being connected with a vertical formwork. According to the construction equipment and method, steel bar binding and pouring of a vertical wall are conducted firstly, the vertical wall formwork is lifted along with the steel platform after being removed, and then beam slab pouring is conducted. A formwork hangin