Construction equipment and method for hanging, integrally splicing and integrally lifting building vertical formwork
The invention relates to construction equipment and method for hanging, integrally splicing and integrally lifting a building vertical formwork. The construction equipment is used for being installed on a steel platform of a building machine, and comprises an I-shaped steel hanging head, I-shaped st...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention relates to construction equipment and method for hanging, integrally splicing and integrally lifting a building vertical formwork. The construction equipment is used for being installed on a steel platform of a building machine, and comprises an I-shaped steel hanging head, I-shaped steel, a pulley hanging point, a turn buckle, a hanging rod and a U-shaped clamping ring; and the I-shaped steel is arranged at any position of the steel platform through the I-shaped steel hanging head; the pulley lifting point is arranged on the I-shaped steel and connected with the hanging rod through the turn buckle, and the U-shaped clamping ring is arranged at the tail end of the hanging rod and used for being connected with a vertical formwork. According to the construction equipment and method, steel bar binding and pouring of a vertical wall are conducted firstly, the vertical wall formwork is lifted along with the steel platform after being removed, and then beam slab pouring is conducted. A formwork hangin |
---|