Virtual power plant building method considering comprehensive efficiency evaluation
The invention relates to electrical equipment, electrical engineering, power generation and power supply, and aims to determine a virtual power plant member selection scheme which enables the overall potential function of a virtual power plant to be maximum, so that the overall quality of the virtua...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention relates to electrical equipment, electrical engineering, power generation and power supply, and aims to determine a virtual power plant member selection scheme which enables the overall potential function of a virtual power plant to be maximum, so that the overall quality of the virtual power plant members can be optimized, the service level and the power supply capacity can be improved, and meanwhile, each member can obtain satisfactory economic benefits. According to the virtual power plant building method considering the comprehensive efficiency evaluation, on the basis of a CCR model and a cross efficiency CCR model, the cross efficiency CCR model is gamed, an average cross efficiency model is corrected by adding secondary constraints, a virtual power plant member evaluation index system is built, and a virtual power plant member mathematical model considering the comprehensive efficiency evaluation is built; finally, a potential game-based virtual power plant member selection model is estab |
---|