Multi-dimensional rapid building method for high-strength bamboo corridor

The invention relates to a multi-dimensional rapid building method for a high-strength bamboo corridor, and belongs to the technical field of bamboo corridors. The multi-dimensional rapid building method comprises the following operation steps of 1, connecting and fixing the upper ends and the lower...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LU JUN, TONG CANLIANG, ZHANG CUIFANG, SUN GUOJUN, ZHOU YANG, NI LIANG, WANG XUEYING, GU XIAOXIA, LU JIANWEI, WANG FANG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention relates to a multi-dimensional rapid building method for a high-strength bamboo corridor, and belongs to the technical field of bamboo corridors. The multi-dimensional rapid building method comprises the following operation steps of 1, connecting and fixing the upper ends and the lower ends of a plurality of adjacent wall bamboo rafts by using hoops; 2, enabling the two rows of wall assemblies and the ground to be symmetrically distributed in a vertical insertion mode, and then fixedly connecting the upper ends of the wall assemblies in a binding mode through connecting cross rods and hoops; 3, erecting a top beam at the upper end of the connecting cross rod; 4, arranging cover rods to be inserted into the upper ends of the top beams at the upper ends of side ceilings, and enabling the two ends of the cover rods to be in sealed connection with the ceilings through waterproof glass cement; and 5, inserting stool frames into the inner sides of the lower portions of the wall bamboo rafts, placing a