Construction method for green exploration groove in low mountain and hill areas
The invention discloses a construction method for a green exploration groove in low mountain and hilly areas. Landfill equipment comprises a landfill box, a through groove is formed in the surface of the landfill box, and a cover plate is slidably connected to the surface of the through groove. The...
Gespeichert in:
Hauptverfasser: | , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a construction method for a green exploration groove in low mountain and hilly areas. Landfill equipment comprises a landfill box, a through groove is formed in the surface of the landfill box, and a cover plate is slidably connected to the surface of the through groove. The invention relates to the technical field of geological exploration. According to the construction method for the green exploration groove in the low mountain and hilly areas, during excavation, layered excavation is conducted according to the soil layer of soil, the excavated soil layer is evenly poured to the bottom of the landfill box, then the top of a first layer is covered with a second layer, after exploration is completed, the exploration groove is backfilled, the landfill box is reversely placed at the top of the exploration groove by lifting a lifting frame, then a bottom extrusion plate is treaded, the soil layer in the landfill box is compacted, then the cover plate is pulled, the soil layer falls down f |
---|