Construction method for built-in tower crane of super high-rise building
The invention discloses a construction method for a built-in tower crane of a super high-rise building. The construction method comprises the steps of positioning and model selection, foundation design and calculation, foundation pre-burying and construction, initial installation of the tower crane,...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | ZHOU JIABAO ZENG GUANGQING LI HUIYING LI MING TANG DAWEI LUO HONGLIANG TANG PEISHAN WU JUNFENG ZENG JIA LIU XINHONG LIN YUCHEN YANG CHUNMING HUANG LIANGZHONG CHEN YIWEN OU JIANHUI |
description | The invention discloses a construction method for a built-in tower crane of a super high-rise building. The construction method comprises the steps of positioning and model selection, foundation design and calculation, foundation pre-burying and construction, initial installation of the tower crane, jacking planning, wall-attached node design and pre-burying construction, installation of seven wall-attached supports, seven times of jacking and node adding, step-by-step dismantling of a roof crane and filling of a shaft. The construction method comprehensively considers the structural characteristics and construction characteristics of various types of super high-rise buildings, can better assist in completing various work contents in the construction process of the super high-rise buildings and solving existing related problems, is complete, comprehensive, safe, feasible and high in universality, and can be widely applied to super high-rise building project construction, and the tower crane is arranged in a c |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN112960566A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN112960566A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN112960566A3</originalsourceid><addsrcrecordid>eNrjZPBwzs8rLikqTS7JzM9TyE0tychPUUjLL1JIKs3MKdHNzFMoyS9PLVJILkrMS1XIT1MoLi0AcjMy0zN0izKLU8HqUjLz0nkYWNMSc4pTeaE0N4Oim2uIs4duakF-fGpxQWJyal5qSbyzn6GhkaWZgamZmaMxMWoAszY0Wg</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Construction method for built-in tower crane of super high-rise building</title><source>esp@cenet</source><creator>ZHOU JIABAO ; ZENG GUANGQING ; LI HUIYING ; LI MING ; TANG DAWEI ; LUO HONGLIANG ; TANG PEISHAN ; WU JUNFENG ; ZENG JIA ; LIU XINHONG ; LIN YUCHEN ; YANG CHUNMING ; HUANG LIANGZHONG ; CHEN YIWEN ; OU JIANHUI</creator><creatorcontrib>ZHOU JIABAO ; ZENG GUANGQING ; LI HUIYING ; LI MING ; TANG DAWEI ; LUO HONGLIANG ; TANG PEISHAN ; WU JUNFENG ; ZENG JIA ; LIU XINHONG ; LIN YUCHEN ; YANG CHUNMING ; HUANG LIANGZHONG ; CHEN YIWEN ; OU JIANHUI</creatorcontrib><description>The invention discloses a construction method for a built-in tower crane of a super high-rise building. The construction method comprises the steps of positioning and model selection, foundation design and calculation, foundation pre-burying and construction, initial installation of the tower crane, jacking planning, wall-attached node design and pre-burying construction, installation of seven wall-attached supports, seven times of jacking and node adding, step-by-step dismantling of a roof crane and filling of a shaft. The construction method comprehensively considers the structural characteristics and construction characteristics of various types of super high-rise buildings, can better assist in completing various work contents in the construction process of the super high-rise buildings and solving existing related problems, is complete, comprehensive, safe, feasible and high in universality, and can be widely applied to super high-rise building project construction, and the tower crane is arranged in a c</description><language>chi ; eng</language><subject>CRANES ; HAULING ; HOISTING ; LIFTING ; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES ; PERFORMING OPERATIONS ; TRANSPORTING</subject><creationdate>2021</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20210615&DB=EPODOC&CC=CN&NR=112960566A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20210615&DB=EPODOC&CC=CN&NR=112960566A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHOU JIABAO</creatorcontrib><creatorcontrib>ZENG GUANGQING</creatorcontrib><creatorcontrib>LI HUIYING</creatorcontrib><creatorcontrib>LI MING</creatorcontrib><creatorcontrib>TANG DAWEI</creatorcontrib><creatorcontrib>LUO HONGLIANG</creatorcontrib><creatorcontrib>TANG PEISHAN</creatorcontrib><creatorcontrib>WU JUNFENG</creatorcontrib><creatorcontrib>ZENG JIA</creatorcontrib><creatorcontrib>LIU XINHONG</creatorcontrib><creatorcontrib>LIN YUCHEN</creatorcontrib><creatorcontrib>YANG CHUNMING</creatorcontrib><creatorcontrib>HUANG LIANGZHONG</creatorcontrib><creatorcontrib>CHEN YIWEN</creatorcontrib><creatorcontrib>OU JIANHUI</creatorcontrib><title>Construction method for built-in tower crane of super high-rise building</title><description>The invention discloses a construction method for a built-in tower crane of a super high-rise building. The construction method comprises the steps of positioning and model selection, foundation design and calculation, foundation pre-burying and construction, initial installation of the tower crane, jacking planning, wall-attached node design and pre-burying construction, installation of seven wall-attached supports, seven times of jacking and node adding, step-by-step dismantling of a roof crane and filling of a shaft. The construction method comprehensively considers the structural characteristics and construction characteristics of various types of super high-rise buildings, can better assist in completing various work contents in the construction process of the super high-rise buildings and solving existing related problems, is complete, comprehensive, safe, feasible and high in universality, and can be widely applied to super high-rise building project construction, and the tower crane is arranged in a c</description><subject>CRANES</subject><subject>HAULING</subject><subject>HOISTING</subject><subject>LIFTING</subject><subject>LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES</subject><subject>PERFORMING OPERATIONS</subject><subject>TRANSPORTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2021</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZPBwzs8rLikqTS7JzM9TyE0tychPUUjLL1JIKs3MKdHNzFMoyS9PLVJILkrMS1XIT1MoLi0AcjMy0zN0izKLU8HqUjLz0nkYWNMSc4pTeaE0N4Oim2uIs4duakF-fGpxQWJyal5qSbyzn6GhkaWZgamZmaMxMWoAszY0Wg</recordid><startdate>20210615</startdate><enddate>20210615</enddate><creator>ZHOU JIABAO</creator><creator>ZENG GUANGQING</creator><creator>LI HUIYING</creator><creator>LI MING</creator><creator>TANG DAWEI</creator><creator>LUO HONGLIANG</creator><creator>TANG PEISHAN</creator><creator>WU JUNFENG</creator><creator>ZENG JIA</creator><creator>LIU XINHONG</creator><creator>LIN YUCHEN</creator><creator>YANG CHUNMING</creator><creator>HUANG LIANGZHONG</creator><creator>CHEN YIWEN</creator><creator>OU JIANHUI</creator><scope>EVB</scope></search><sort><creationdate>20210615</creationdate><title>Construction method for built-in tower crane of super high-rise building</title><author>ZHOU JIABAO ; ZENG GUANGQING ; LI HUIYING ; LI MING ; TANG DAWEI ; LUO HONGLIANG ; TANG PEISHAN ; WU JUNFENG ; ZENG JIA ; LIU XINHONG ; LIN YUCHEN ; YANG CHUNMING ; HUANG LIANGZHONG ; CHEN YIWEN ; OU JIANHUI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN112960566A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2021</creationdate><topic>CRANES</topic><topic>HAULING</topic><topic>HOISTING</topic><topic>LIFTING</topic><topic>LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES</topic><topic>PERFORMING OPERATIONS</topic><topic>TRANSPORTING</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHOU JIABAO</creatorcontrib><creatorcontrib>ZENG GUANGQING</creatorcontrib><creatorcontrib>LI HUIYING</creatorcontrib><creatorcontrib>LI MING</creatorcontrib><creatorcontrib>TANG DAWEI</creatorcontrib><creatorcontrib>LUO HONGLIANG</creatorcontrib><creatorcontrib>TANG PEISHAN</creatorcontrib><creatorcontrib>WU JUNFENG</creatorcontrib><creatorcontrib>ZENG JIA</creatorcontrib><creatorcontrib>LIU XINHONG</creatorcontrib><creatorcontrib>LIN YUCHEN</creatorcontrib><creatorcontrib>YANG CHUNMING</creatorcontrib><creatorcontrib>HUANG LIANGZHONG</creatorcontrib><creatorcontrib>CHEN YIWEN</creatorcontrib><creatorcontrib>OU JIANHUI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHOU JIABAO</au><au>ZENG GUANGQING</au><au>LI HUIYING</au><au>LI MING</au><au>TANG DAWEI</au><au>LUO HONGLIANG</au><au>TANG PEISHAN</au><au>WU JUNFENG</au><au>ZENG JIA</au><au>LIU XINHONG</au><au>LIN YUCHEN</au><au>YANG CHUNMING</au><au>HUANG LIANGZHONG</au><au>CHEN YIWEN</au><au>OU JIANHUI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Construction method for built-in tower crane of super high-rise building</title><date>2021-06-15</date><risdate>2021</risdate><abstract>The invention discloses a construction method for a built-in tower crane of a super high-rise building. The construction method comprises the steps of positioning and model selection, foundation design and calculation, foundation pre-burying and construction, initial installation of the tower crane, jacking planning, wall-attached node design and pre-burying construction, installation of seven wall-attached supports, seven times of jacking and node adding, step-by-step dismantling of a roof crane and filling of a shaft. The construction method comprehensively considers the structural characteristics and construction characteristics of various types of super high-rise buildings, can better assist in completing various work contents in the construction process of the super high-rise buildings and solving existing related problems, is complete, comprehensive, safe, feasible and high in universality, and can be widely applied to super high-rise building project construction, and the tower crane is arranged in a c</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN112960566A |
source | esp@cenet |
subjects | CRANES HAULING HOISTING LIFTING LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES PERFORMING OPERATIONS TRANSPORTING |
title | Construction method for built-in tower crane of super high-rise building |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-01T08%3A55%3A54IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHOU%20JIABAO&rft.date=2021-06-15&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN112960566A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |