Construction method for built-in tower crane of super high-rise building

The invention discloses a construction method for a built-in tower crane of a super high-rise building. The construction method comprises the steps of positioning and model selection, foundation design and calculation, foundation pre-burying and construction, initial installation of the tower crane,...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHOU JIABAO, ZENG GUANGQING, LI HUIYING, LI MING, TANG DAWEI, LUO HONGLIANG, TANG PEISHAN, WU JUNFENG, ZENG JIA, LIU XINHONG, LIN YUCHEN, YANG CHUNMING, HUANG LIANGZHONG, CHEN YIWEN, OU JIANHUI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator ZHOU JIABAO
ZENG GUANGQING
LI HUIYING
LI MING
TANG DAWEI
LUO HONGLIANG
TANG PEISHAN
WU JUNFENG
ZENG JIA
LIU XINHONG
LIN YUCHEN
YANG CHUNMING
HUANG LIANGZHONG
CHEN YIWEN
OU JIANHUI
description The invention discloses a construction method for a built-in tower crane of a super high-rise building. The construction method comprises the steps of positioning and model selection, foundation design and calculation, foundation pre-burying and construction, initial installation of the tower crane, jacking planning, wall-attached node design and pre-burying construction, installation of seven wall-attached supports, seven times of jacking and node adding, step-by-step dismantling of a roof crane and filling of a shaft. The construction method comprehensively considers the structural characteristics and construction characteristics of various types of super high-rise buildings, can better assist in completing various work contents in the construction process of the super high-rise buildings and solving existing related problems, is complete, comprehensive, safe, feasible and high in universality, and can be widely applied to super high-rise building project construction, and the tower crane is arranged in a c
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN112960566A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN112960566A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN112960566A3</originalsourceid><addsrcrecordid>eNrjZPBwzs8rLikqTS7JzM9TyE0tychPUUjLL1JIKs3MKdHNzFMoyS9PLVJILkrMS1XIT1MoLi0AcjMy0zN0izKLU8HqUjLz0nkYWNMSc4pTeaE0N4Oim2uIs4duakF-fGpxQWJyal5qSbyzn6GhkaWZgamZmaMxMWoAszY0Wg</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Construction method for built-in tower crane of super high-rise building</title><source>esp@cenet</source><creator>ZHOU JIABAO ; ZENG GUANGQING ; LI HUIYING ; LI MING ; TANG DAWEI ; LUO HONGLIANG ; TANG PEISHAN ; WU JUNFENG ; ZENG JIA ; LIU XINHONG ; LIN YUCHEN ; YANG CHUNMING ; HUANG LIANGZHONG ; CHEN YIWEN ; OU JIANHUI</creator><creatorcontrib>ZHOU JIABAO ; ZENG GUANGQING ; LI HUIYING ; LI MING ; TANG DAWEI ; LUO HONGLIANG ; TANG PEISHAN ; WU JUNFENG ; ZENG JIA ; LIU XINHONG ; LIN YUCHEN ; YANG CHUNMING ; HUANG LIANGZHONG ; CHEN YIWEN ; OU JIANHUI</creatorcontrib><description>The invention discloses a construction method for a built-in tower crane of a super high-rise building. The construction method comprises the steps of positioning and model selection, foundation design and calculation, foundation pre-burying and construction, initial installation of the tower crane, jacking planning, wall-attached node design and pre-burying construction, installation of seven wall-attached supports, seven times of jacking and node adding, step-by-step dismantling of a roof crane and filling of a shaft. The construction method comprehensively considers the structural characteristics and construction characteristics of various types of super high-rise buildings, can better assist in completing various work contents in the construction process of the super high-rise buildings and solving existing related problems, is complete, comprehensive, safe, feasible and high in universality, and can be widely applied to super high-rise building project construction, and the tower crane is arranged in a c</description><language>chi ; eng</language><subject>CRANES ; HAULING ; HOISTING ; LIFTING ; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES ; PERFORMING OPERATIONS ; TRANSPORTING</subject><creationdate>2021</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20210615&amp;DB=EPODOC&amp;CC=CN&amp;NR=112960566A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20210615&amp;DB=EPODOC&amp;CC=CN&amp;NR=112960566A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHOU JIABAO</creatorcontrib><creatorcontrib>ZENG GUANGQING</creatorcontrib><creatorcontrib>LI HUIYING</creatorcontrib><creatorcontrib>LI MING</creatorcontrib><creatorcontrib>TANG DAWEI</creatorcontrib><creatorcontrib>LUO HONGLIANG</creatorcontrib><creatorcontrib>TANG PEISHAN</creatorcontrib><creatorcontrib>WU JUNFENG</creatorcontrib><creatorcontrib>ZENG JIA</creatorcontrib><creatorcontrib>LIU XINHONG</creatorcontrib><creatorcontrib>LIN YUCHEN</creatorcontrib><creatorcontrib>YANG CHUNMING</creatorcontrib><creatorcontrib>HUANG LIANGZHONG</creatorcontrib><creatorcontrib>CHEN YIWEN</creatorcontrib><creatorcontrib>OU JIANHUI</creatorcontrib><title>Construction method for built-in tower crane of super high-rise building</title><description>The invention discloses a construction method for a built-in tower crane of a super high-rise building. The construction method comprises the steps of positioning and model selection, foundation design and calculation, foundation pre-burying and construction, initial installation of the tower crane, jacking planning, wall-attached node design and pre-burying construction, installation of seven wall-attached supports, seven times of jacking and node adding, step-by-step dismantling of a roof crane and filling of a shaft. The construction method comprehensively considers the structural characteristics and construction characteristics of various types of super high-rise buildings, can better assist in completing various work contents in the construction process of the super high-rise buildings and solving existing related problems, is complete, comprehensive, safe, feasible and high in universality, and can be widely applied to super high-rise building project construction, and the tower crane is arranged in a c</description><subject>CRANES</subject><subject>HAULING</subject><subject>HOISTING</subject><subject>LIFTING</subject><subject>LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES</subject><subject>PERFORMING OPERATIONS</subject><subject>TRANSPORTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2021</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZPBwzs8rLikqTS7JzM9TyE0tychPUUjLL1JIKs3MKdHNzFMoyS9PLVJILkrMS1XIT1MoLi0AcjMy0zN0izKLU8HqUjLz0nkYWNMSc4pTeaE0N4Oim2uIs4duakF-fGpxQWJyal5qSbyzn6GhkaWZgamZmaMxMWoAszY0Wg</recordid><startdate>20210615</startdate><enddate>20210615</enddate><creator>ZHOU JIABAO</creator><creator>ZENG GUANGQING</creator><creator>LI HUIYING</creator><creator>LI MING</creator><creator>TANG DAWEI</creator><creator>LUO HONGLIANG</creator><creator>TANG PEISHAN</creator><creator>WU JUNFENG</creator><creator>ZENG JIA</creator><creator>LIU XINHONG</creator><creator>LIN YUCHEN</creator><creator>YANG CHUNMING</creator><creator>HUANG LIANGZHONG</creator><creator>CHEN YIWEN</creator><creator>OU JIANHUI</creator><scope>EVB</scope></search><sort><creationdate>20210615</creationdate><title>Construction method for built-in tower crane of super high-rise building</title><author>ZHOU JIABAO ; ZENG GUANGQING ; LI HUIYING ; LI MING ; TANG DAWEI ; LUO HONGLIANG ; TANG PEISHAN ; WU JUNFENG ; ZENG JIA ; LIU XINHONG ; LIN YUCHEN ; YANG CHUNMING ; HUANG LIANGZHONG ; CHEN YIWEN ; OU JIANHUI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN112960566A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2021</creationdate><topic>CRANES</topic><topic>HAULING</topic><topic>HOISTING</topic><topic>LIFTING</topic><topic>LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES</topic><topic>PERFORMING OPERATIONS</topic><topic>TRANSPORTING</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHOU JIABAO</creatorcontrib><creatorcontrib>ZENG GUANGQING</creatorcontrib><creatorcontrib>LI HUIYING</creatorcontrib><creatorcontrib>LI MING</creatorcontrib><creatorcontrib>TANG DAWEI</creatorcontrib><creatorcontrib>LUO HONGLIANG</creatorcontrib><creatorcontrib>TANG PEISHAN</creatorcontrib><creatorcontrib>WU JUNFENG</creatorcontrib><creatorcontrib>ZENG JIA</creatorcontrib><creatorcontrib>LIU XINHONG</creatorcontrib><creatorcontrib>LIN YUCHEN</creatorcontrib><creatorcontrib>YANG CHUNMING</creatorcontrib><creatorcontrib>HUANG LIANGZHONG</creatorcontrib><creatorcontrib>CHEN YIWEN</creatorcontrib><creatorcontrib>OU JIANHUI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHOU JIABAO</au><au>ZENG GUANGQING</au><au>LI HUIYING</au><au>LI MING</au><au>TANG DAWEI</au><au>LUO HONGLIANG</au><au>TANG PEISHAN</au><au>WU JUNFENG</au><au>ZENG JIA</au><au>LIU XINHONG</au><au>LIN YUCHEN</au><au>YANG CHUNMING</au><au>HUANG LIANGZHONG</au><au>CHEN YIWEN</au><au>OU JIANHUI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Construction method for built-in tower crane of super high-rise building</title><date>2021-06-15</date><risdate>2021</risdate><abstract>The invention discloses a construction method for a built-in tower crane of a super high-rise building. The construction method comprises the steps of positioning and model selection, foundation design and calculation, foundation pre-burying and construction, initial installation of the tower crane, jacking planning, wall-attached node design and pre-burying construction, installation of seven wall-attached supports, seven times of jacking and node adding, step-by-step dismantling of a roof crane and filling of a shaft. The construction method comprehensively considers the structural characteristics and construction characteristics of various types of super high-rise buildings, can better assist in completing various work contents in the construction process of the super high-rise buildings and solving existing related problems, is complete, comprehensive, safe, feasible and high in universality, and can be widely applied to super high-rise building project construction, and the tower crane is arranged in a c</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN112960566A
source esp@cenet
subjects CRANES
HAULING
HOISTING
LIFTING
LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES
PERFORMING OPERATIONS
TRANSPORTING
title Construction method for built-in tower crane of super high-rise building
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-01T08%3A55%3A54IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHOU%20JIABAO&rft.date=2021-06-15&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN112960566A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true