Construction method for built-in tower crane of super high-rise building
The invention discloses a construction method for a built-in tower crane of a super high-rise building. The construction method comprises the steps of positioning and model selection, foundation design and calculation, foundation pre-burying and construction, initial installation of the tower crane,...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a construction method for a built-in tower crane of a super high-rise building. The construction method comprises the steps of positioning and model selection, foundation design and calculation, foundation pre-burying and construction, initial installation of the tower crane, jacking planning, wall-attached node design and pre-burying construction, installation of seven wall-attached supports, seven times of jacking and node adding, step-by-step dismantling of a roof crane and filling of a shaft. The construction method comprehensively considers the structural characteristics and construction characteristics of various types of super high-rise buildings, can better assist in completing various work contents in the construction process of the super high-rise buildings and solving existing related problems, is complete, comprehensive, safe, feasible and high in universality, and can be widely applied to super high-rise building project construction, and the tower crane is arranged in a c |
---|