Construction method for hanging top blasting treatment of underground mine
The invention discloses a construction method, particularly discloses a construction method for hanging top blasting treatment of an underground mine, and belongs to the technical field of mining production processes. According to the construction method for hanging top blasting treatment of the und...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a construction method, particularly discloses a construction method for hanging top blasting treatment of an underground mine, and belongs to the technical field of mining production processes. According to the construction method for hanging top blasting treatment of the underground mine, the treatment effect is good, the hanging top treatment time can be greatly shortened, and the treatment cost can be greatly reduced. The construction method comprises the following steps that firstly, on the basis of an existing blast hole in the hanging top, an explosive pot and a treatment blast hole are obtained through at least one time of reaming blasting, then quantitative explosives are loaded into the explosive pot through the treatment blast hole, and finally the blasting treatment work of the underground mine hanging top is completed through the blasting of the quantitative explosives.
本发明公开了一种施工方法,尤其是公开了一种用于地下矿山悬顶爆破处理的施工方法,属于采矿生工艺技术领域。提供一种处理效果好,能大幅度减少悬顶处理时间和处理成本的用于地下矿山悬顶爆破处理的施工方法。所述的施工方法先 |
---|