Extra-long tunnel water burst prevention and control system and construction method thereof
The invention provides an extra-long tunnel water burst prevention and control system and a construction method thereof. The prevention and control system comprises a water retaining wall formed by concrete pouring, wherein the water retaining wall is arranged at the position away from the main tunn...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention provides an extra-long tunnel water burst prevention and control system and a construction method thereof. The prevention and control system comprises a water retaining wall formed by concrete pouring, wherein the water retaining wall is arranged at the position away from the main tunnel face by a preset distance and completely attached to the circumferential side wall of a main tunnel; a water retaining wall foundation is formed at the bottom of the water retaining wall through pouring; a foundation trench for containing the water retaining wall foundation is dug in the bottom of a main tunnel foundation pit; the periphery of the water retaining wall is anchored into bed rock through mortar anchor rods; guide pipes are pre-buried in the water retaining wall and extend in the tunneling direction; the two ends of each guide pipe extend out of the water retaining wall; the guide pipes are arranged in a plum blossom shape; temporary drainage ditches are formed in the positions, close to the two sid |
---|