Regional integrated energy system planning method considering power supply reliability

The invention discloses a regional integrated energy system planning method considering power supply reliability. The method is specifically implemented according to the following steps: step 1, simulating uncertain factors in a regional integrated energy system through scene analysis; step 2, estab...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: TUO LIHAO, HE HAO, DUAN JIANDONG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a regional integrated energy system planning method considering power supply reliability. The method is specifically implemented according to the following steps: step 1, simulating uncertain factors in a regional integrated energy system through scene analysis; step 2, establishing an objective function with the minimum fault load shedding expectation; step 3, establishing two planning objectives of maximum project full-cycle net income and maximum renewable energy permeability; 4, designing constraint conditions for safe and stable operation of the integrated energy system, and judging whether the operation of the integrated energy system meets the constraint conditions or not; and 5, solving the mathematical model by adopting a non-dominated sorting genetic algorithm 3 to obtain different planning schemes. According to the invention, power-to-gas equipment scheduling planning is performed based on sensitivity analysis, so that the power-to-gas equipment reasonably outputs power to c