Hydroelectric generating set primary frequency modulation assessment and evaluation system installed on power plant side
The invention discloses a hydroelectric generating set primary frequency modulation assessment and evaluation system installed at a power plant side, and the system comprises an assessment analysis and evaluation module, a real-time data collection module, a data management module, a data communicat...
Gespeichert in:
Hauptverfasser: | , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a hydroelectric generating set primary frequency modulation assessment and evaluation system installed at a power plant side, and the system comprises an assessment analysis and evaluation module, a real-time data collection module, a data management module, a data communication module, a GPS time service module, an authority management module, and a data processing and format conversion module. The real-time data acquisition module and the GPS time service module are connected to the data processing and format conversion module through the data communication module, the data processing and format conversion module is connected to the data management module, the data management module is connected to the assessment analysis and evaluation module, and the assessment analysis and evaluation module is connected to the scheduling system. According to the method, assessment calculation and analysis are moved to the power plant side from the scheduling side, all related data of all primary f |
---|