Construction method for improving jacking efficiency of large frame bridge
The invention discloses a construction method for improving the jacking efficiency of a large frame bridge. The construction method comprises the following construction steps of excavating a working pit, and prefabricating the frame bridge; constructing overhead piles, and erecting auxiliary beams a...
Gespeichert in:
Hauptverfasser: | , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a construction method for improving the jacking efficiency of a large frame bridge. The construction method comprises the following construction steps of excavating a working pit, and prefabricating the frame bridge; constructing overhead piles, and erecting auxiliary beams and overhead lines; after the overhead operation of the line is completed, setting out the central axis of the frame bridge in place on one side of the non-working pit of the line, and excavating a channel by taking the central axis as a reference until reaching a jacking surface; jacking the frame bridge, excavating earthwork along the jacking section of the frame bridge in the channel, and discharging the earthwork from one side of the non-working pit of the line; in the jacking earth cutting process, adjusting the elevation position and the horizontal position of the frame bridge through overexcavation and under-excavation. According to the method, a reverse soil excavating and discardingprocess is adopted, the s |
---|