Construction method for improving jacking efficiency of large frame bridge

The invention discloses a construction method for improving the jacking efficiency of a large frame bridge. The construction method comprises the following construction steps of excavating a working pit, and prefabricating the frame bridge; constructing overhead piles, and erecting auxiliary beams a...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LEI LU'EN, CUI HAOQI, MA XUEHUI, ZHAO HONGYIN, DAI XIAOSONG, YE YISHENG, LIU CHENGGANG, FAN CHI, ZHONG QIKAI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a construction method for improving the jacking efficiency of a large frame bridge. The construction method comprises the following construction steps of excavating a working pit, and prefabricating the frame bridge; constructing overhead piles, and erecting auxiliary beams and overhead lines; after the overhead operation of the line is completed, setting out the central axis of the frame bridge in place on one side of the non-working pit of the line, and excavating a channel by taking the central axis as a reference until reaching a jacking surface; jacking the frame bridge, excavating earthwork along the jacking section of the frame bridge in the channel, and discharging the earthwork from one side of the non-working pit of the line; in the jacking earth cutting process, adjusting the elevation position and the horizontal position of the frame bridge through overexcavation and under-excavation. According to the method, a reverse soil excavating and discardingprocess is adopted, the s