Tunneling construction method for super-large-section reloading chamber
The invention discloses a tunneling construction method for a super-large-section reloading chamber. The method adopts a roadheader for tunneling construction, and specifically comprises the followingsteps that (1) a chamber external measure roadway is constructed from a shaft bottom passenger stati...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | SU XIAOQIANG YU HUAJIANG MENG ZEXUN WANG XUEFENG LIU PENG YU BO YAN JIEXING SHANG DONGSHENG GUO QINGRUI JIA JIANGWEI XIE HONGGUANG LI LIANGHONG ZHANG JUGUO |
description | The invention discloses a tunneling construction method for a super-large-section reloading chamber. The method adopts a roadheader for tunneling construction, and specifically comprises the followingsteps that (1) a chamber external measure roadway is constructed from a shaft bottom passenger station to reach the central position of the top arch of the reloading chamber; (2) first-layer tunneling pilot tunnel construction is performed from the central position of the top arch of the reloading chamber to form a semicircular arch top plate; (3) a thin spray material is sprayed on an anchor netarranged on the semicircular arch top plate for reinforcement; (4) a ventilation ramp communicated with the exit of the reloading chamber is formed by tunneling in the reloading chamber to achieve full-air-pressure ventilation; and (5) tunneling construction is performed downwards through a step layering method to finally reach a designed bottom plate height to complete reloading chamber construction. The method has the a |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN112196542A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN112196542A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN112196542A3</originalsourceid><addsrcrecordid>eNrjZHAPKc3LS83JzEtXSM7PKy4pKk0uyczPU8hNLcnIT1FIyy9SKC4tSC3SzUksSk_VLU6FSBel5uQnpoB1ZSTmJqUW8TCwpiXmFKfyQmluBkU31xBnD93Ugvz41OKCxOTUvNSSeGc_Q0MjQ0szUxMjR2Ni1AAAzHI0ow</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Tunneling construction method for super-large-section reloading chamber</title><source>esp@cenet</source><creator>SU XIAOQIANG ; YU HUAJIANG ; MENG ZEXUN ; WANG XUEFENG ; LIU PENG ; YU BO ; YAN JIEXING ; SHANG DONGSHENG ; GUO QINGRUI ; JIA JIANGWEI ; XIE HONGGUANG ; LI LIANGHONG ; ZHANG JUGUO</creator><creatorcontrib>SU XIAOQIANG ; YU HUAJIANG ; MENG ZEXUN ; WANG XUEFENG ; LIU PENG ; YU BO ; YAN JIEXING ; SHANG DONGSHENG ; GUO QINGRUI ; JIA JIANGWEI ; XIE HONGGUANG ; LI LIANGHONG ; ZHANG JUGUO</creatorcontrib><description>The invention discloses a tunneling construction method for a super-large-section reloading chamber. The method adopts a roadheader for tunneling construction, and specifically comprises the followingsteps that (1) a chamber external measure roadway is constructed from a shaft bottom passenger station to reach the central position of the top arch of the reloading chamber; (2) first-layer tunneling pilot tunnel construction is performed from the central position of the top arch of the reloading chamber to form a semicircular arch top plate; (3) a thin spray material is sprayed on an anchor netarranged on the semicircular arch top plate for reinforcement; (4) a ventilation ramp communicated with the exit of the reloading chamber is formed by tunneling in the reloading chamber to achieve full-air-pressure ventilation; and (5) tunneling construction is performed downwards through a step layering method to finally reach a designed bottom plate height to complete reloading chamber construction. The method has the a</description><language>chi ; eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS ; SHAFTS ; TUNNELS</subject><creationdate>2021</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20210108&DB=EPODOC&CC=CN&NR=112196542A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25563,76318</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20210108&DB=EPODOC&CC=CN&NR=112196542A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>SU XIAOQIANG</creatorcontrib><creatorcontrib>YU HUAJIANG</creatorcontrib><creatorcontrib>MENG ZEXUN</creatorcontrib><creatorcontrib>WANG XUEFENG</creatorcontrib><creatorcontrib>LIU PENG</creatorcontrib><creatorcontrib>YU BO</creatorcontrib><creatorcontrib>YAN JIEXING</creatorcontrib><creatorcontrib>SHANG DONGSHENG</creatorcontrib><creatorcontrib>GUO QINGRUI</creatorcontrib><creatorcontrib>JIA JIANGWEI</creatorcontrib><creatorcontrib>XIE HONGGUANG</creatorcontrib><creatorcontrib>LI LIANGHONG</creatorcontrib><creatorcontrib>ZHANG JUGUO</creatorcontrib><title>Tunneling construction method for super-large-section reloading chamber</title><description>The invention discloses a tunneling construction method for a super-large-section reloading chamber. The method adopts a roadheader for tunneling construction, and specifically comprises the followingsteps that (1) a chamber external measure roadway is constructed from a shaft bottom passenger station to reach the central position of the top arch of the reloading chamber; (2) first-layer tunneling pilot tunnel construction is performed from the central position of the top arch of the reloading chamber to form a semicircular arch top plate; (3) a thin spray material is sprayed on an anchor netarranged on the semicircular arch top plate for reinforcement; (4) a ventilation ramp communicated with the exit of the reloading chamber is formed by tunneling in the reloading chamber to achieve full-air-pressure ventilation; and (5) tunneling construction is performed downwards through a step layering method to finally reach a designed bottom plate height to complete reloading chamber construction. The method has the a</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2021</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHAPKc3LS83JzEtXSM7PKy4pKk0uyczPU8hNLcnIT1FIyy9SKC4tSC3SzUksSk_VLU6FSBel5uQnpoB1ZSTmJqUW8TCwpiXmFKfyQmluBkU31xBnD93Ugvz41OKCxOTUvNSSeGc_Q0MjQ0szUxMjR2Ni1AAAzHI0ow</recordid><startdate>20210108</startdate><enddate>20210108</enddate><creator>SU XIAOQIANG</creator><creator>YU HUAJIANG</creator><creator>MENG ZEXUN</creator><creator>WANG XUEFENG</creator><creator>LIU PENG</creator><creator>YU BO</creator><creator>YAN JIEXING</creator><creator>SHANG DONGSHENG</creator><creator>GUO QINGRUI</creator><creator>JIA JIANGWEI</creator><creator>XIE HONGGUANG</creator><creator>LI LIANGHONG</creator><creator>ZHANG JUGUO</creator><scope>EVB</scope></search><sort><creationdate>20210108</creationdate><title>Tunneling construction method for super-large-section reloading chamber</title><author>SU XIAOQIANG ; YU HUAJIANG ; MENG ZEXUN ; WANG XUEFENG ; LIU PENG ; YU BO ; YAN JIEXING ; SHANG DONGSHENG ; GUO QINGRUI ; JIA JIANGWEI ; XIE HONGGUANG ; LI LIANGHONG ; ZHANG JUGUO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN112196542A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2021</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>SU XIAOQIANG</creatorcontrib><creatorcontrib>YU HUAJIANG</creatorcontrib><creatorcontrib>MENG ZEXUN</creatorcontrib><creatorcontrib>WANG XUEFENG</creatorcontrib><creatorcontrib>LIU PENG</creatorcontrib><creatorcontrib>YU BO</creatorcontrib><creatorcontrib>YAN JIEXING</creatorcontrib><creatorcontrib>SHANG DONGSHENG</creatorcontrib><creatorcontrib>GUO QINGRUI</creatorcontrib><creatorcontrib>JIA JIANGWEI</creatorcontrib><creatorcontrib>XIE HONGGUANG</creatorcontrib><creatorcontrib>LI LIANGHONG</creatorcontrib><creatorcontrib>ZHANG JUGUO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>SU XIAOQIANG</au><au>YU HUAJIANG</au><au>MENG ZEXUN</au><au>WANG XUEFENG</au><au>LIU PENG</au><au>YU BO</au><au>YAN JIEXING</au><au>SHANG DONGSHENG</au><au>GUO QINGRUI</au><au>JIA JIANGWEI</au><au>XIE HONGGUANG</au><au>LI LIANGHONG</au><au>ZHANG JUGUO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Tunneling construction method for super-large-section reloading chamber</title><date>2021-01-08</date><risdate>2021</risdate><abstract>The invention discloses a tunneling construction method for a super-large-section reloading chamber. The method adopts a roadheader for tunneling construction, and specifically comprises the followingsteps that (1) a chamber external measure roadway is constructed from a shaft bottom passenger station to reach the central position of the top arch of the reloading chamber; (2) first-layer tunneling pilot tunnel construction is performed from the central position of the top arch of the reloading chamber to form a semicircular arch top plate; (3) a thin spray material is sprayed on an anchor netarranged on the semicircular arch top plate for reinforcement; (4) a ventilation ramp communicated with the exit of the reloading chamber is formed by tunneling in the reloading chamber to achieve full-air-pressure ventilation; and (5) tunneling construction is performed downwards through a step layering method to finally reach a designed bottom plate height to complete reloading chamber construction. The method has the a</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN112196542A |
source | esp@cenet |
subjects | EARTH DRILLING FIXED CONSTRUCTIONS GALLERIES LARGE UNDERGROUND CHAMBERS MINING SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS SHAFTS TUNNELS |
title | Tunneling construction method for super-large-section reloading chamber |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-12T04%3A43%3A04IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=SU%20XIAOQIANG&rft.date=2021-01-08&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN112196542A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |