Tunneling construction method for super-large-section reloading chamber

The invention discloses a tunneling construction method for a super-large-section reloading chamber. The method adopts a roadheader for tunneling construction, and specifically comprises the followingsteps that (1) a chamber external measure roadway is constructed from a shaft bottom passenger stati...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: SU XIAOQIANG, YU HUAJIANG, MENG ZEXUN, WANG XUEFENG, LIU PENG, YU BO, YAN JIEXING, SHANG DONGSHENG, GUO QINGRUI, JIA JIANGWEI, XIE HONGGUANG, LI LIANGHONG, ZHANG JUGUO
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator SU XIAOQIANG
YU HUAJIANG
MENG ZEXUN
WANG XUEFENG
LIU PENG
YU BO
YAN JIEXING
SHANG DONGSHENG
GUO QINGRUI
JIA JIANGWEI
XIE HONGGUANG
LI LIANGHONG
ZHANG JUGUO
description The invention discloses a tunneling construction method for a super-large-section reloading chamber. The method adopts a roadheader for tunneling construction, and specifically comprises the followingsteps that (1) a chamber external measure roadway is constructed from a shaft bottom passenger station to reach the central position of the top arch of the reloading chamber; (2) first-layer tunneling pilot tunnel construction is performed from the central position of the top arch of the reloading chamber to form a semicircular arch top plate; (3) a thin spray material is sprayed on an anchor netarranged on the semicircular arch top plate for reinforcement; (4) a ventilation ramp communicated with the exit of the reloading chamber is formed by tunneling in the reloading chamber to achieve full-air-pressure ventilation; and (5) tunneling construction is performed downwards through a step layering method to finally reach a designed bottom plate height to complete reloading chamber construction. The method has the a
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN112196542A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN112196542A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN112196542A3</originalsourceid><addsrcrecordid>eNrjZHAPKc3LS83JzEtXSM7PKy4pKk0uyczPU8hNLcnIT1FIyy9SKC4tSC3SzUksSk_VLU6FSBel5uQnpoB1ZSTmJqUW8TCwpiXmFKfyQmluBkU31xBnD93Ugvz41OKCxOTUvNSSeGc_Q0MjQ0szUxMjR2Ni1AAAzHI0ow</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Tunneling construction method for super-large-section reloading chamber</title><source>esp@cenet</source><creator>SU XIAOQIANG ; YU HUAJIANG ; MENG ZEXUN ; WANG XUEFENG ; LIU PENG ; YU BO ; YAN JIEXING ; SHANG DONGSHENG ; GUO QINGRUI ; JIA JIANGWEI ; XIE HONGGUANG ; LI LIANGHONG ; ZHANG JUGUO</creator><creatorcontrib>SU XIAOQIANG ; YU HUAJIANG ; MENG ZEXUN ; WANG XUEFENG ; LIU PENG ; YU BO ; YAN JIEXING ; SHANG DONGSHENG ; GUO QINGRUI ; JIA JIANGWEI ; XIE HONGGUANG ; LI LIANGHONG ; ZHANG JUGUO</creatorcontrib><description>The invention discloses a tunneling construction method for a super-large-section reloading chamber. The method adopts a roadheader for tunneling construction, and specifically comprises the followingsteps that (1) a chamber external measure roadway is constructed from a shaft bottom passenger station to reach the central position of the top arch of the reloading chamber; (2) first-layer tunneling pilot tunnel construction is performed from the central position of the top arch of the reloading chamber to form a semicircular arch top plate; (3) a thin spray material is sprayed on an anchor netarranged on the semicircular arch top plate for reinforcement; (4) a ventilation ramp communicated with the exit of the reloading chamber is formed by tunneling in the reloading chamber to achieve full-air-pressure ventilation; and (5) tunneling construction is performed downwards through a step layering method to finally reach a designed bottom plate height to complete reloading chamber construction. The method has the a</description><language>chi ; eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS ; SHAFTS ; TUNNELS</subject><creationdate>2021</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20210108&amp;DB=EPODOC&amp;CC=CN&amp;NR=112196542A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25563,76318</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20210108&amp;DB=EPODOC&amp;CC=CN&amp;NR=112196542A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>SU XIAOQIANG</creatorcontrib><creatorcontrib>YU HUAJIANG</creatorcontrib><creatorcontrib>MENG ZEXUN</creatorcontrib><creatorcontrib>WANG XUEFENG</creatorcontrib><creatorcontrib>LIU PENG</creatorcontrib><creatorcontrib>YU BO</creatorcontrib><creatorcontrib>YAN JIEXING</creatorcontrib><creatorcontrib>SHANG DONGSHENG</creatorcontrib><creatorcontrib>GUO QINGRUI</creatorcontrib><creatorcontrib>JIA JIANGWEI</creatorcontrib><creatorcontrib>XIE HONGGUANG</creatorcontrib><creatorcontrib>LI LIANGHONG</creatorcontrib><creatorcontrib>ZHANG JUGUO</creatorcontrib><title>Tunneling construction method for super-large-section reloading chamber</title><description>The invention discloses a tunneling construction method for a super-large-section reloading chamber. The method adopts a roadheader for tunneling construction, and specifically comprises the followingsteps that (1) a chamber external measure roadway is constructed from a shaft bottom passenger station to reach the central position of the top arch of the reloading chamber; (2) first-layer tunneling pilot tunnel construction is performed from the central position of the top arch of the reloading chamber to form a semicircular arch top plate; (3) a thin spray material is sprayed on an anchor netarranged on the semicircular arch top plate for reinforcement; (4) a ventilation ramp communicated with the exit of the reloading chamber is formed by tunneling in the reloading chamber to achieve full-air-pressure ventilation; and (5) tunneling construction is performed downwards through a step layering method to finally reach a designed bottom plate height to complete reloading chamber construction. The method has the a</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2021</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHAPKc3LS83JzEtXSM7PKy4pKk0uyczPU8hNLcnIT1FIyy9SKC4tSC3SzUksSk_VLU6FSBel5uQnpoB1ZSTmJqUW8TCwpiXmFKfyQmluBkU31xBnD93Ugvz41OKCxOTUvNSSeGc_Q0MjQ0szUxMjR2Ni1AAAzHI0ow</recordid><startdate>20210108</startdate><enddate>20210108</enddate><creator>SU XIAOQIANG</creator><creator>YU HUAJIANG</creator><creator>MENG ZEXUN</creator><creator>WANG XUEFENG</creator><creator>LIU PENG</creator><creator>YU BO</creator><creator>YAN JIEXING</creator><creator>SHANG DONGSHENG</creator><creator>GUO QINGRUI</creator><creator>JIA JIANGWEI</creator><creator>XIE HONGGUANG</creator><creator>LI LIANGHONG</creator><creator>ZHANG JUGUO</creator><scope>EVB</scope></search><sort><creationdate>20210108</creationdate><title>Tunneling construction method for super-large-section reloading chamber</title><author>SU XIAOQIANG ; YU HUAJIANG ; MENG ZEXUN ; WANG XUEFENG ; LIU PENG ; YU BO ; YAN JIEXING ; SHANG DONGSHENG ; GUO QINGRUI ; JIA JIANGWEI ; XIE HONGGUANG ; LI LIANGHONG ; ZHANG JUGUO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN112196542A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2021</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>SU XIAOQIANG</creatorcontrib><creatorcontrib>YU HUAJIANG</creatorcontrib><creatorcontrib>MENG ZEXUN</creatorcontrib><creatorcontrib>WANG XUEFENG</creatorcontrib><creatorcontrib>LIU PENG</creatorcontrib><creatorcontrib>YU BO</creatorcontrib><creatorcontrib>YAN JIEXING</creatorcontrib><creatorcontrib>SHANG DONGSHENG</creatorcontrib><creatorcontrib>GUO QINGRUI</creatorcontrib><creatorcontrib>JIA JIANGWEI</creatorcontrib><creatorcontrib>XIE HONGGUANG</creatorcontrib><creatorcontrib>LI LIANGHONG</creatorcontrib><creatorcontrib>ZHANG JUGUO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>SU XIAOQIANG</au><au>YU HUAJIANG</au><au>MENG ZEXUN</au><au>WANG XUEFENG</au><au>LIU PENG</au><au>YU BO</au><au>YAN JIEXING</au><au>SHANG DONGSHENG</au><au>GUO QINGRUI</au><au>JIA JIANGWEI</au><au>XIE HONGGUANG</au><au>LI LIANGHONG</au><au>ZHANG JUGUO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Tunneling construction method for super-large-section reloading chamber</title><date>2021-01-08</date><risdate>2021</risdate><abstract>The invention discloses a tunneling construction method for a super-large-section reloading chamber. The method adopts a roadheader for tunneling construction, and specifically comprises the followingsteps that (1) a chamber external measure roadway is constructed from a shaft bottom passenger station to reach the central position of the top arch of the reloading chamber; (2) first-layer tunneling pilot tunnel construction is performed from the central position of the top arch of the reloading chamber to form a semicircular arch top plate; (3) a thin spray material is sprayed on an anchor netarranged on the semicircular arch top plate for reinforcement; (4) a ventilation ramp communicated with the exit of the reloading chamber is formed by tunneling in the reloading chamber to achieve full-air-pressure ventilation; and (5) tunneling construction is performed downwards through a step layering method to finally reach a designed bottom plate height to complete reloading chamber construction. The method has the a</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN112196542A
source esp@cenet
subjects EARTH DRILLING
FIXED CONSTRUCTIONS
GALLERIES
LARGE UNDERGROUND CHAMBERS
MINING
SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS
SHAFTS
TUNNELS
title Tunneling construction method for super-large-section reloading chamber
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-12T04%3A43%3A04IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=SU%20XIAOQIANG&rft.date=2021-01-08&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN112196542A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true