Tunneling construction method for super-large-section reloading chamber

The invention discloses a tunneling construction method for a super-large-section reloading chamber. The method adopts a roadheader for tunneling construction, and specifically comprises the followingsteps that (1) a chamber external measure roadway is constructed from a shaft bottom passenger stati...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: SU XIAOQIANG, YU HUAJIANG, MENG ZEXUN, WANG XUEFENG, LIU PENG, YU BO, YAN JIEXING, SHANG DONGSHENG, GUO QINGRUI, JIA JIANGWEI, XIE HONGGUANG, LI LIANGHONG, ZHANG JUGUO
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a tunneling construction method for a super-large-section reloading chamber. The method adopts a roadheader for tunneling construction, and specifically comprises the followingsteps that (1) a chamber external measure roadway is constructed from a shaft bottom passenger station to reach the central position of the top arch of the reloading chamber; (2) first-layer tunneling pilot tunnel construction is performed from the central position of the top arch of the reloading chamber to form a semicircular arch top plate; (3) a thin spray material is sprayed on an anchor netarranged on the semicircular arch top plate for reinforcement; (4) a ventilation ramp communicated with the exit of the reloading chamber is formed by tunneling in the reloading chamber to achieve full-air-pressure ventilation; and (5) tunneling construction is performed downwards through a step layering method to finally reach a designed bottom plate height to complete reloading chamber construction. The method has the a