Street lamp construction resource scheduling method and system, storage medium and device

The invention discloses a street lamp construction resource scheduling method and system, a storage medium and a device. The resource scheduling method preferentially arranges a task with the highestresource demand degree on the whole, so that the centralized utilization of resources is achieved, sc...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: QIN WEITONG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a street lamp construction resource scheduling method and system, a storage medium and a device. The resource scheduling method preferentially arranges a task with the highestresource demand degree on the whole, so that the centralized utilization of resources is achieved, scarce resources can be liberated from the task as soon as possible, and the impact on other tasks can be ended as soon as possible so as to shorten the engineering construction period as much as possible. 本发明公开了一种路灯建设资源调度方法、系统、存储介质和装置,所述资源调度方法,优先安排整体上资源被需求程度最高的任务,实现了资源的集中利用,能够尽早地将紧缺资源从任务中解放出来,尽早结束对其它任务的影响,这样就能得到尽可能短的工程工期。