Real-time power generation scheduling feedback control method
The invention provides a real-time power generation scheduling feedback control method. The method specifically comprises the following steps of: 1) generating a correction amount; 2) calculating theadjustment amount of a controllable unit; 3) calculating the comprehensive adjustment amount of the c...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention provides a real-time power generation scheduling feedback control method. The method specifically comprises the following steps of: 1) generating a correction amount; 2) calculating theadjustment amount of a controllable unit; 3) calculating the comprehensive adjustment amount of the controllable unit; 4) according to various principles, carrying out economic dispatching on the adjustment amount, and distributing a required feasible power generation amount to each generator set; 5) sending scheduling plans to each set. According to the method, real-time scheduling indexes and assessment indexes are combined, the power generation hysteresis caused by technical factors and human factors in actual operation is analyzed and processed, the effectiveness of real-time scheduling isimproved, and the requirements of power grid assessment are better met.
本发明提出了一种实时发电调度反馈控制方法,所述方法具体包括以下步骤:1)生成修正量;2)计算可控单元调整量;3)计算可控单元综合调整量;4)根据各种原则,对调整量进行经济调度,并将所需的可行发电量分配到各发电机组;5)发给各机组调度计划。本发明将实时调度指标与考核指标相结合,分析和处理了实际运行中由技术因 |
---|