Composite base layer and floor direct-paving quick-mounting design structure for purifying formaldehyde and mounting method
The invention provides a composite base layer and floor direct-paving quick-mounting design structure for purifying formaldehyde. Firstly, a first ground base layer, a second ground base layer, and afloor layer are arranged; the first ground base layer is laid on the ground; the second ground base l...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention provides a composite base layer and floor direct-paving quick-mounting design structure for purifying formaldehyde. Firstly, a first ground base layer, a second ground base layer, and afloor layer are arranged; the first ground base layer is laid on the ground; the second ground base layer is laid on the first ground base layer; and the floor layer is laid on the second ground baselayer. The first ground base layer comprises an extruded sheet and gypsum-based self-leveling mortar; the second ground base layer comprises activated carbon particles and the gypsum-based self-leveling mortar; and the floor layer comprises a plurality of buckle connecting parts and a plurality of floor bodies. The buckle connecting parts are fixed to the second ground base layer, and the floor bodies are connected between the buckle connecting parts in a clamped mode. The invention further provides a mounting method of the composite floor direct-paving quick-mounting design structure for purifying formaldehyde. Compar |
---|