Existing building elevator foundation deepening four-wall supporting construction method

The invention relates to an existing building elevator foundation deepening four-wall supporting construction method and belongs to the technical field of elevator reinforcement. The existing buildingelevator foundation deepening four-wall supporting construction method comprises the following steps...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WANG MINGLIANG, WANG XIN, SUN CHAOSHUO, LIU QIANG, ZHAO BO, FENG PINGHUA, WANG LIMIN, HOU KEFANG, WANG YONGZHI, LIU ZHIYONG, ZHAO WENYING, GUO JIANMING, LI WEI, MA LIANG, QIN SUWEI, NIU LIJUN, DU YUCHUAN, YANG LEI, LIANG XIAORAN, YANG CUIZHUO, WANG HAIJUN, WANG JIASEN, TANG BAOTAO, SHENG YUN, YIN QINGMIAO, SONG JUNLING, LIU YONGQIANG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention relates to an existing building elevator foundation deepening four-wall supporting construction method and belongs to the technical field of elevator reinforcement. The existing buildingelevator foundation deepening four-wall supporting construction method comprises the following steps: statically cutting an opening on an original elevator four-wall position according to a snapped external edge line; drilling holes on the original structural foundation of the periphery of the original elevator four-wall position at mounting column underfoot steel plates; mounting steel columns and steel beams; and carrying out settling observation. Through the formation of the opening on the original elevator four-wall position and through the supporting of the steel beams, the load of the upper part of the elevator four-wall position directly acts on a steel structure supporting system, the layer-by-layer erection of full scaffolding is not needed, and the influence on the constructionor normal use of an upper-