Hanging part of facility installed below roof of steel structure
The invention discloses a hanging part of a facility installed below a roof of a steel structure. The hanging part comprises a piece of first left angle steel (2) and a piece of first right angle steel (3). The first left angle steel (2) and the first right angle steel (3) are in an upright state, a...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a hanging part of a facility installed below a roof of a steel structure. The hanging part comprises a piece of first left angle steel (2) and a piece of first right angle steel (3). The first left angle steel (2) and the first right angle steel (3) are in an upright state, and the first left angle steel (2) and the first right angle steel (3) are arranged in a separated mode in the left-and-right direction. The first left angle steel (2) and the first right angle steel (3) are connected with a second threaded rod (7) through a first threaded rod (4), and the first threaded rod (4) is located above the second threaded rod (7). The first left angle steel (2) and the first right angle steel (3) can be fixed outside a first purlin (1), a connecting piece is connected with the lower end of the first right angle steel (3), and the second threaded rod (7) is located above the connecting piece. By the adoption of the hanging part of the facility installed below the roof of the steel structure |
---|