DC power transmission receiving end power grid section out-of-limit adjustment method and system

The invention provides a DC power transmission receiving end power grid section out-of-limit adjustment method and system. The method comprises the steps of: performing simulation on receiving end power grid section out-of-limit after a flexible DC blocking fault occurs for multiple times; extractin...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: SONG XURI, YAN BO, GENG YAN, WANG MIAO, QI XIAOLIN, QIU CHENGJIAN, MU YONGZHENG, YANG NAN, WEI ZECHEN, HAN YI, ZHANG PENG, LIU MENG, GUO KAI, HUANG YUPENG, ZHANG FENGBIN, LYU YAN, XIE LIN, YE RUILI, FENG QIONG, WANG YAN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention provides a DC power transmission receiving end power grid section out-of-limit adjustment method and system. The method comprises the steps of: performing simulation on receiving end power grid section out-of-limit after a flexible DC blocking fault occurs for multiple times; extracting a plurality of groups of units, load adjustment strategies and section state change data of the receiving-end power grid after fault simulation, and performing data processing to form a database; performing association analysis on the database; constraining front and back items of the strong association rule to generate a constrained strong association rule; and adjusting the out-of-limit section according to the generated constrained strong association rule. The method is based on an association rule algorithm in an artificial intelligence algorithm; data processing and correlation analysis are performed on massive fault data, the analysis efficiency of the algorithm is greatly improved through consequent and co