Basin cascade hydropower station group compensation benefit solving and benefit distribution method

The invention discloses a compensation benefit solving and benefit distribution method suitable for a cascade hydropower station group of a drainage basin. The method comprises: proposing a solution thought for obtaining the compensation benefit of any benefit application power station of the basin...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: SHI CHAOBO, WANG LEI, LI WENBIN, WANG JING, ZHANG TAIHENG, ZHANG LECHEN, WU YAO, YANG MING, HE YONG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a compensation benefit solving and benefit distribution method suitable for a cascade hydropower station group of a drainage basin. The method comprises: proposing a solution thought for obtaining the compensation benefit of any benefit application power station of the basin cascade for each downstream power station; determining an objective function based on a solving idea, determining constraint conditions in combination with actual scheduling conditions of the basin, determining a solving algorithm, and establishing a basin cascade compensation benefit model; and calculating to obtain the pairwise relationship between the benefit application power station and each downstream power station through the model. Based on the TOPSIS theory, a compensation benefit distribution method for the cascade existence of a plurality of benefit application power stations is established. According to the method, a solving thought for obtaining the compensation benefit of any benefit application power