Machine fault-oriented prefabricated building prefabricated part production rescheduling optimization method
The invention relates to the field of fabricated building supply chains and industrial engineering, in particular to a machine fault-oriented fabricated building prefabricated part production rescheduling optimization method. According to the method provided by the invention, rescheduling dynamic op...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | WANG CHAOJING MA XIAOPING |
description | The invention relates to the field of fabricated building supply chains and industrial engineering, in particular to a machine fault-oriented fabricated building prefabricated part production rescheduling optimization method. According to the method provided by the invention, rescheduling dynamic optimization is carried out on prefabricated part production under machine fault interference from three steps of production line selection, component production priority determination and component rescheduling; and then, on the basis of the optimal solution, actual production factors such as different production process characteristics, multiple production lines, operation waiting, resource limitation and mold sharing of the prefabricated part are comprehensively considered, and optimal scheme simulation evaluation is carried out, so that the actual applicability of the rescheduling scheme is improved, and the goals of on-time delivery and production cost minimization of the prefabricated part under fault interfere |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN111610758A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN111610758A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN111610758A3</originalsourceid><addsrcrecordid>eNqNirsKAjEQRdNYiPoP8QMWDOKjlUWx0cp-mU0mm4FsEpJJ49fripWV1eWec-bC30A7CigtVM9NzISB0ciU0UKfScP0-kreUBh-cILMbxRN1UwxyIxFOzTVT2lMTCM94WNGZBfNUsws-IKr7y7E-nJ-tNcGU-ywJNAYkLv2rpTaq81hdzxt_2le5vhDUA</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Machine fault-oriented prefabricated building prefabricated part production rescheduling optimization method</title><source>esp@cenet</source><creator>WANG CHAOJING ; MA XIAOPING</creator><creatorcontrib>WANG CHAOJING ; MA XIAOPING</creatorcontrib><description>The invention relates to the field of fabricated building supply chains and industrial engineering, in particular to a machine fault-oriented fabricated building prefabricated part production rescheduling optimization method. According to the method provided by the invention, rescheduling dynamic optimization is carried out on prefabricated part production under machine fault interference from three steps of production line selection, component production priority determination and component rescheduling; and then, on the basis of the optimal solution, actual production factors such as different production process characteristics, multiple production lines, operation waiting, resource limitation and mold sharing of the prefabricated part are comprehensively considered, and optimal scheme simulation evaluation is carried out, so that the actual applicability of the rescheduling scheme is improved, and the goals of on-time delivery and production cost minimization of the prefabricated part under fault interfere</description><language>chi ; eng</language><subject>CONTROL OR REGULATING SYSTEMS IN GENERAL ; CONTROLLING ; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS ; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS ; PHYSICS ; REGULATING</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20200901&DB=EPODOC&CC=CN&NR=111610758A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,777,882,25545,76296</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20200901&DB=EPODOC&CC=CN&NR=111610758A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WANG CHAOJING</creatorcontrib><creatorcontrib>MA XIAOPING</creatorcontrib><title>Machine fault-oriented prefabricated building prefabricated part production rescheduling optimization method</title><description>The invention relates to the field of fabricated building supply chains and industrial engineering, in particular to a machine fault-oriented fabricated building prefabricated part production rescheduling optimization method. According to the method provided by the invention, rescheduling dynamic optimization is carried out on prefabricated part production under machine fault interference from three steps of production line selection, component production priority determination and component rescheduling; and then, on the basis of the optimal solution, actual production factors such as different production process characteristics, multiple production lines, operation waiting, resource limitation and mold sharing of the prefabricated part are comprehensively considered, and optimal scheme simulation evaluation is carried out, so that the actual applicability of the rescheduling scheme is improved, and the goals of on-time delivery and production cost minimization of the prefabricated part under fault interfere</description><subject>CONTROL OR REGULATING SYSTEMS IN GENERAL</subject><subject>CONTROLLING</subject><subject>FUNCTIONAL ELEMENTS OF SUCH SYSTEMS</subject><subject>MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS</subject><subject>PHYSICS</subject><subject>REGULATING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNirsKAjEQRdNYiPoP8QMWDOKjlUWx0cp-mU0mm4FsEpJJ49fripWV1eWec-bC30A7CigtVM9NzISB0ciU0UKfScP0-kreUBh-cILMbxRN1UwxyIxFOzTVT2lMTCM94WNGZBfNUsws-IKr7y7E-nJ-tNcGU-ywJNAYkLv2rpTaq81hdzxt_2le5vhDUA</recordid><startdate>20200901</startdate><enddate>20200901</enddate><creator>WANG CHAOJING</creator><creator>MA XIAOPING</creator><scope>EVB</scope></search><sort><creationdate>20200901</creationdate><title>Machine fault-oriented prefabricated building prefabricated part production rescheduling optimization method</title><author>WANG CHAOJING ; MA XIAOPING</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN111610758A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2020</creationdate><topic>CONTROL OR REGULATING SYSTEMS IN GENERAL</topic><topic>CONTROLLING</topic><topic>FUNCTIONAL ELEMENTS OF SUCH SYSTEMS</topic><topic>MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS</topic><topic>PHYSICS</topic><topic>REGULATING</topic><toplevel>online_resources</toplevel><creatorcontrib>WANG CHAOJING</creatorcontrib><creatorcontrib>MA XIAOPING</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WANG CHAOJING</au><au>MA XIAOPING</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Machine fault-oriented prefabricated building prefabricated part production rescheduling optimization method</title><date>2020-09-01</date><risdate>2020</risdate><abstract>The invention relates to the field of fabricated building supply chains and industrial engineering, in particular to a machine fault-oriented fabricated building prefabricated part production rescheduling optimization method. According to the method provided by the invention, rescheduling dynamic optimization is carried out on prefabricated part production under machine fault interference from three steps of production line selection, component production priority determination and component rescheduling; and then, on the basis of the optimal solution, actual production factors such as different production process characteristics, multiple production lines, operation waiting, resource limitation and mold sharing of the prefabricated part are comprehensively considered, and optimal scheme simulation evaluation is carried out, so that the actual applicability of the rescheduling scheme is improved, and the goals of on-time delivery and production cost minimization of the prefabricated part under fault interfere</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN111610758A |
source | esp@cenet |
subjects | CONTROL OR REGULATING SYSTEMS IN GENERAL CONTROLLING FUNCTIONAL ELEMENTS OF SUCH SYSTEMS MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS PHYSICS REGULATING |
title | Machine fault-oriented prefabricated building prefabricated part production rescheduling optimization method |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-20T02%3A59%3A33IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WANG%20CHAOJING&rft.date=2020-09-01&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN111610758A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |