Machine fault-oriented prefabricated building prefabricated part production rescheduling optimization method

The invention relates to the field of fabricated building supply chains and industrial engineering, in particular to a machine fault-oriented fabricated building prefabricated part production rescheduling optimization method. According to the method provided by the invention, rescheduling dynamic op...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WANG CHAOJING, MA XIAOPING
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention relates to the field of fabricated building supply chains and industrial engineering, in particular to a machine fault-oriented fabricated building prefabricated part production rescheduling optimization method. According to the method provided by the invention, rescheduling dynamic optimization is carried out on prefabricated part production under machine fault interference from three steps of production line selection, component production priority determination and component rescheduling; and then, on the basis of the optimal solution, actual production factors such as different production process characteristics, multiple production lines, operation waiting, resource limitation and mold sharing of the prefabricated part are comprehensively considered, and optimal scheme simulation evaluation is carried out, so that the actual applicability of the rescheduling scheme is improved, and the goals of on-time delivery and production cost minimization of the prefabricated part under fault interfere