Short-distance arranged new and old concrete dam in dangerous reservoir dam reconstruction engineering as well as method

The invention relates to a short-distance arranged new and old concrete dam in dangerous reservoir dam reconstruction engineering as well as a method, and belongs to the field of large and medium-sized dangerous dam reconstruction. The short-distance arranged new and old concrete dam comprises an or...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WU YUNZHENG, QU YINGLEI, YANG CHENGZHU, HAO LIXUN, LYU JUNZHUO, WANG FUYUN, LIU JIE, SU JIALIN, MIAO QIANG, ZHAO LIWANG, LIU TAO, WANG ZHI, DONG YANCHAO, FU XU, WANG YU, ZHANG ZHIFU, YIN JIANAN, WANG YONGTAN, WANG HAO, CHENG LONG, HU YUNHE, LI RUNWEI, LU ZHENGANG, MENG JIHUI, CHEN QUANBAO, ZHAO LIANG, MA ZHIQIANG, WANG TIEFENG, LIU QINGLI, GUO JIANYE, LIU YALIAN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator WU YUNZHENG
QU YINGLEI
YANG CHENGZHU
HAO LIXUN
LYU JUNZHUO
WANG FUYUN
LIU JIE
SU JIALIN
MIAO QIANG
ZHAO LIWANG
LIU TAO
WANG ZHI
DONG YANCHAO
FU XU
WANG YU
ZHANG ZHIFU
YIN JIANAN
WANG YONGTAN
WANG HAO
CHENG LONG
HU YUNHE
LI RUNWEI
LU ZHENGANG
MENG JIHUI
CHEN QUANBAO
ZHAO LIANG
MA ZHIQIANG
WANG TIEFENG
LIU QINGLI
GUO JIANYE
LIU YALIAN
description The invention relates to a short-distance arranged new and old concrete dam in dangerous reservoir dam reconstruction engineering as well as a method, and belongs to the field of large and medium-sized dangerous dam reconstruction. The short-distance arranged new and old concrete dam comprises an original reservoir dam and a downstream original functional building, wherein a newly-built dam is positioned on the downstream side of the original reservoir dam and the upstream side of the original functional building; the original reservoir dam and the newly-built dam communicate through a left-bank dam road and a right-bank dam road; and a diversion tunnel is positioned in the original reservoir dam and the left-bank mountain of the newly-built dam. The short-distance arranged new and old concrete dam in dangerous reservoir dam has the advantages that the newly-built dam is positioned on the downstream side of the original reservoir dam, the original reservoir dam also serves as an upstream cofferdam when servin
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN111593705A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN111593705A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN111593705A3</originalsourceid><addsrcrecordid>eNqNyjEKwkAQRuE0FqLeYTxAwBCCWEpQrGy0D8Pub7KwmQ2zG-PxjeIBrL7ivWX2unVBU25dTCwGxKosLSwJJmKxFLwlE8QoEshyT05m5kXDGEkRoc_g9JsU8xmTjia5IARpnQDqpCWONMH7jz1SF-w6WzzYR2x-rrLt-XSvLzmG0CAObCBITX0tiqI6lPtddSz_ed7Vs0aI</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Short-distance arranged new and old concrete dam in dangerous reservoir dam reconstruction engineering as well as method</title><source>esp@cenet</source><creator>WU YUNZHENG ; QU YINGLEI ; YANG CHENGZHU ; HAO LIXUN ; LYU JUNZHUO ; WANG FUYUN ; LIU JIE ; SU JIALIN ; MIAO QIANG ; ZHAO LIWANG ; LIU TAO ; WANG ZHI ; DONG YANCHAO ; FU XU ; WANG YU ; ZHANG ZHIFU ; YIN JIANAN ; WANG YONGTAN ; WANG HAO ; CHENG LONG ; HU YUNHE ; LI RUNWEI ; LU ZHENGANG ; MENG JIHUI ; CHEN QUANBAO ; ZHAO LIANG ; MA ZHIQIANG ; WANG TIEFENG ; LIU QINGLI ; GUO JIANYE ; LIU YALIAN</creator><creatorcontrib>WU YUNZHENG ; QU YINGLEI ; YANG CHENGZHU ; HAO LIXUN ; LYU JUNZHUO ; WANG FUYUN ; LIU JIE ; SU JIALIN ; MIAO QIANG ; ZHAO LIWANG ; LIU TAO ; WANG ZHI ; DONG YANCHAO ; FU XU ; WANG YU ; ZHANG ZHIFU ; YIN JIANAN ; WANG YONGTAN ; WANG HAO ; CHENG LONG ; HU YUNHE ; LI RUNWEI ; LU ZHENGANG ; MENG JIHUI ; CHEN QUANBAO ; ZHAO LIANG ; MA ZHIQIANG ; WANG TIEFENG ; LIU QINGLI ; GUO JIANYE ; LIU YALIAN</creatorcontrib><description>The invention relates to a short-distance arranged new and old concrete dam in dangerous reservoir dam reconstruction engineering as well as a method, and belongs to the field of large and medium-sized dangerous dam reconstruction. The short-distance arranged new and old concrete dam comprises an original reservoir dam and a downstream original functional building, wherein a newly-built dam is positioned on the downstream side of the original reservoir dam and the upstream side of the original functional building; the original reservoir dam and the newly-built dam communicate through a left-bank dam road and a right-bank dam road; and a diversion tunnel is positioned in the original reservoir dam and the left-bank mountain of the newly-built dam. The short-distance arranged new and old concrete dam in dangerous reservoir dam has the advantages that the newly-built dam is positioned on the downstream side of the original reservoir dam, the original reservoir dam also serves as an upstream cofferdam when servin</description><language>chi ; eng</language><subject>FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20200828&amp;DB=EPODOC&amp;CC=CN&amp;NR=111593705A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20200828&amp;DB=EPODOC&amp;CC=CN&amp;NR=111593705A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WU YUNZHENG</creatorcontrib><creatorcontrib>QU YINGLEI</creatorcontrib><creatorcontrib>YANG CHENGZHU</creatorcontrib><creatorcontrib>HAO LIXUN</creatorcontrib><creatorcontrib>LYU JUNZHUO</creatorcontrib><creatorcontrib>WANG FUYUN</creatorcontrib><creatorcontrib>LIU JIE</creatorcontrib><creatorcontrib>SU JIALIN</creatorcontrib><creatorcontrib>MIAO QIANG</creatorcontrib><creatorcontrib>ZHAO LIWANG</creatorcontrib><creatorcontrib>LIU TAO</creatorcontrib><creatorcontrib>WANG ZHI</creatorcontrib><creatorcontrib>DONG YANCHAO</creatorcontrib><creatorcontrib>FU XU</creatorcontrib><creatorcontrib>WANG YU</creatorcontrib><creatorcontrib>ZHANG ZHIFU</creatorcontrib><creatorcontrib>YIN JIANAN</creatorcontrib><creatorcontrib>WANG YONGTAN</creatorcontrib><creatorcontrib>WANG HAO</creatorcontrib><creatorcontrib>CHENG LONG</creatorcontrib><creatorcontrib>HU YUNHE</creatorcontrib><creatorcontrib>LI RUNWEI</creatorcontrib><creatorcontrib>LU ZHENGANG</creatorcontrib><creatorcontrib>MENG JIHUI</creatorcontrib><creatorcontrib>CHEN QUANBAO</creatorcontrib><creatorcontrib>ZHAO LIANG</creatorcontrib><creatorcontrib>MA ZHIQIANG</creatorcontrib><creatorcontrib>WANG TIEFENG</creatorcontrib><creatorcontrib>LIU QINGLI</creatorcontrib><creatorcontrib>GUO JIANYE</creatorcontrib><creatorcontrib>LIU YALIAN</creatorcontrib><title>Short-distance arranged new and old concrete dam in dangerous reservoir dam reconstruction engineering as well as method</title><description>The invention relates to a short-distance arranged new and old concrete dam in dangerous reservoir dam reconstruction engineering as well as a method, and belongs to the field of large and medium-sized dangerous dam reconstruction. The short-distance arranged new and old concrete dam comprises an original reservoir dam and a downstream original functional building, wherein a newly-built dam is positioned on the downstream side of the original reservoir dam and the upstream side of the original functional building; the original reservoir dam and the newly-built dam communicate through a left-bank dam road and a right-bank dam road; and a diversion tunnel is positioned in the original reservoir dam and the left-bank mountain of the newly-built dam. The short-distance arranged new and old concrete dam in dangerous reservoir dam has the advantages that the newly-built dam is positioned on the downstream side of the original reservoir dam, the original reservoir dam also serves as an upstream cofferdam when servin</description><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyjEKwkAQRuE0FqLeYTxAwBCCWEpQrGy0D8Pub7KwmQ2zG-PxjeIBrL7ivWX2unVBU25dTCwGxKosLSwJJmKxFLwlE8QoEshyT05m5kXDGEkRoc_g9JsU8xmTjia5IARpnQDqpCWONMH7jz1SF-w6WzzYR2x-rrLt-XSvLzmG0CAObCBITX0tiqI6lPtddSz_ed7Vs0aI</recordid><startdate>20200828</startdate><enddate>20200828</enddate><creator>WU YUNZHENG</creator><creator>QU YINGLEI</creator><creator>YANG CHENGZHU</creator><creator>HAO LIXUN</creator><creator>LYU JUNZHUO</creator><creator>WANG FUYUN</creator><creator>LIU JIE</creator><creator>SU JIALIN</creator><creator>MIAO QIANG</creator><creator>ZHAO LIWANG</creator><creator>LIU TAO</creator><creator>WANG ZHI</creator><creator>DONG YANCHAO</creator><creator>FU XU</creator><creator>WANG YU</creator><creator>ZHANG ZHIFU</creator><creator>YIN JIANAN</creator><creator>WANG YONGTAN</creator><creator>WANG HAO</creator><creator>CHENG LONG</creator><creator>HU YUNHE</creator><creator>LI RUNWEI</creator><creator>LU ZHENGANG</creator><creator>MENG JIHUI</creator><creator>CHEN QUANBAO</creator><creator>ZHAO LIANG</creator><creator>MA ZHIQIANG</creator><creator>WANG TIEFENG</creator><creator>LIU QINGLI</creator><creator>GUO JIANYE</creator><creator>LIU YALIAN</creator><scope>EVB</scope></search><sort><creationdate>20200828</creationdate><title>Short-distance arranged new and old concrete dam in dangerous reservoir dam reconstruction engineering as well as method</title><author>WU YUNZHENG ; QU YINGLEI ; YANG CHENGZHU ; HAO LIXUN ; LYU JUNZHUO ; WANG FUYUN ; LIU JIE ; SU JIALIN ; MIAO QIANG ; ZHAO LIWANG ; LIU TAO ; WANG ZHI ; DONG YANCHAO ; FU XU ; WANG YU ; ZHANG ZHIFU ; YIN JIANAN ; WANG YONGTAN ; WANG HAO ; CHENG LONG ; HU YUNHE ; LI RUNWEI ; LU ZHENGANG ; MENG JIHUI ; CHEN QUANBAO ; ZHAO LIANG ; MA ZHIQIANG ; WANG TIEFENG ; LIU QINGLI ; GUO JIANYE ; LIU YALIAN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN111593705A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2020</creationdate><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><toplevel>online_resources</toplevel><creatorcontrib>WU YUNZHENG</creatorcontrib><creatorcontrib>QU YINGLEI</creatorcontrib><creatorcontrib>YANG CHENGZHU</creatorcontrib><creatorcontrib>HAO LIXUN</creatorcontrib><creatorcontrib>LYU JUNZHUO</creatorcontrib><creatorcontrib>WANG FUYUN</creatorcontrib><creatorcontrib>LIU JIE</creatorcontrib><creatorcontrib>SU JIALIN</creatorcontrib><creatorcontrib>MIAO QIANG</creatorcontrib><creatorcontrib>ZHAO LIWANG</creatorcontrib><creatorcontrib>LIU TAO</creatorcontrib><creatorcontrib>WANG ZHI</creatorcontrib><creatorcontrib>DONG YANCHAO</creatorcontrib><creatorcontrib>FU XU</creatorcontrib><creatorcontrib>WANG YU</creatorcontrib><creatorcontrib>ZHANG ZHIFU</creatorcontrib><creatorcontrib>YIN JIANAN</creatorcontrib><creatorcontrib>WANG YONGTAN</creatorcontrib><creatorcontrib>WANG HAO</creatorcontrib><creatorcontrib>CHENG LONG</creatorcontrib><creatorcontrib>HU YUNHE</creatorcontrib><creatorcontrib>LI RUNWEI</creatorcontrib><creatorcontrib>LU ZHENGANG</creatorcontrib><creatorcontrib>MENG JIHUI</creatorcontrib><creatorcontrib>CHEN QUANBAO</creatorcontrib><creatorcontrib>ZHAO LIANG</creatorcontrib><creatorcontrib>MA ZHIQIANG</creatorcontrib><creatorcontrib>WANG TIEFENG</creatorcontrib><creatorcontrib>LIU QINGLI</creatorcontrib><creatorcontrib>GUO JIANYE</creatorcontrib><creatorcontrib>LIU YALIAN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WU YUNZHENG</au><au>QU YINGLEI</au><au>YANG CHENGZHU</au><au>HAO LIXUN</au><au>LYU JUNZHUO</au><au>WANG FUYUN</au><au>LIU JIE</au><au>SU JIALIN</au><au>MIAO QIANG</au><au>ZHAO LIWANG</au><au>LIU TAO</au><au>WANG ZHI</au><au>DONG YANCHAO</au><au>FU XU</au><au>WANG YU</au><au>ZHANG ZHIFU</au><au>YIN JIANAN</au><au>WANG YONGTAN</au><au>WANG HAO</au><au>CHENG LONG</au><au>HU YUNHE</au><au>LI RUNWEI</au><au>LU ZHENGANG</au><au>MENG JIHUI</au><au>CHEN QUANBAO</au><au>ZHAO LIANG</au><au>MA ZHIQIANG</au><au>WANG TIEFENG</au><au>LIU QINGLI</au><au>GUO JIANYE</au><au>LIU YALIAN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Short-distance arranged new and old concrete dam in dangerous reservoir dam reconstruction engineering as well as method</title><date>2020-08-28</date><risdate>2020</risdate><abstract>The invention relates to a short-distance arranged new and old concrete dam in dangerous reservoir dam reconstruction engineering as well as a method, and belongs to the field of large and medium-sized dangerous dam reconstruction. The short-distance arranged new and old concrete dam comprises an original reservoir dam and a downstream original functional building, wherein a newly-built dam is positioned on the downstream side of the original reservoir dam and the upstream side of the original functional building; the original reservoir dam and the newly-built dam communicate through a left-bank dam road and a right-bank dam road; and a diversion tunnel is positioned in the original reservoir dam and the left-bank mountain of the newly-built dam. The short-distance arranged new and old concrete dam in dangerous reservoir dam has the advantages that the newly-built dam is positioned on the downstream side of the original reservoir dam, the original reservoir dam also serves as an upstream cofferdam when servin</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN111593705A
source esp@cenet
subjects FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
title Short-distance arranged new and old concrete dam in dangerous reservoir dam reconstruction engineering as well as method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-24T19%3A20%3A56IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WU%20YUNZHENG&rft.date=2020-08-28&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN111593705A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true