Short-distance arranged new and old concrete dam in dangerous reservoir dam reconstruction engineering as well as method
The invention relates to a short-distance arranged new and old concrete dam in dangerous reservoir dam reconstruction engineering as well as a method, and belongs to the field of large and medium-sized dangerous dam reconstruction. The short-distance arranged new and old concrete dam comprises an or...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention relates to a short-distance arranged new and old concrete dam in dangerous reservoir dam reconstruction engineering as well as a method, and belongs to the field of large and medium-sized dangerous dam reconstruction. The short-distance arranged new and old concrete dam comprises an original reservoir dam and a downstream original functional building, wherein a newly-built dam is positioned on the downstream side of the original reservoir dam and the upstream side of the original functional building; the original reservoir dam and the newly-built dam communicate through a left-bank dam road and a right-bank dam road; and a diversion tunnel is positioned in the original reservoir dam and the left-bank mountain of the newly-built dam. The short-distance arranged new and old concrete dam in dangerous reservoir dam has the advantages that the newly-built dam is positioned on the downstream side of the original reservoir dam, the original reservoir dam also serves as an upstream cofferdam when servin |
---|