Rapid construction method of prefabricated segmental beam
The invention discloses a rapid construction method of a prefabricated segmental beam, and aims to solve the technical problems of a prefabricated segmental assembled bracket system with the height of8m or unbalanced load and a bracket body supporting technology in the construction of a ramp bridge...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | ZHENG XINMING WANG SHUAI ZHAO ZHANYING FAN RUILI HUANG SHILONG MA JIANAN LI MING QIU ZHI SHI HONGTAO XIE JIYI WANG QIANQIAN LI TAIBAI FENG SHIKAI ZHANG BANG YAN HUAIFENG SHAO ZONGBING GONG MINGXIA LIU SHUZHI WANG ZENG'EN XING LE WANG XI HE TIANQI LIU ZHONGXING CHEN SHULI |
description | The invention discloses a rapid construction method of a prefabricated segmental beam, and aims to solve the technical problems of a prefabricated segmental assembled bracket system with the height of8m or unbalanced load and a bracket body supporting technology in the construction of a ramp bridge with a smaller radius. The rapid construction method of the prefabricated segmental beam comprisesthe following steps that after a foundation is treated, performing measurement and positioning; arranging a disc buckle support; laying main ridges and secondary ridges, and placing jacks; carrying out a preloading test on the stent system; performing primary settlement observation on the prefabricated segmental beams before and after suspension splicing; after settlement stabilization, performingpermanent prestress strand pulling, tensioning and pressure drop of the top plate are conducted according to design; completing permanent prestress construction of the roof; after tensioning of the prestressed steel strands is |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN111549678A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN111549678A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN111549678A3</originalsourceid><addsrcrecordid>eNrjZLAMSizITFFIzs8rLikqTS7JzM9TyE0tychPUchPUygoSk1LTCrKTE4sSU1RKE5Nz03NK0nMUUhKTczlYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GhoamJpZm5haOxsSoAQBnUy8G</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Rapid construction method of prefabricated segmental beam</title><source>esp@cenet</source><creator>ZHENG XINMING ; WANG SHUAI ; ZHAO ZHANYING ; FAN RUILI ; HUANG SHILONG ; MA JIANAN ; LI MING ; QIU ZHI ; SHI HONGTAO ; XIE JIYI ; WANG QIANQIAN ; LI TAIBAI ; FENG SHIKAI ; ZHANG BANG ; YAN HUAIFENG ; SHAO ZONGBING ; GONG MINGXIA ; LIU SHUZHI ; WANG ZENG'EN ; XING LE ; WANG XI ; HE TIANQI ; LIU ZHONGXING ; CHEN SHULI</creator><creatorcontrib>ZHENG XINMING ; WANG SHUAI ; ZHAO ZHANYING ; FAN RUILI ; HUANG SHILONG ; MA JIANAN ; LI MING ; QIU ZHI ; SHI HONGTAO ; XIE JIYI ; WANG QIANQIAN ; LI TAIBAI ; FENG SHIKAI ; ZHANG BANG ; YAN HUAIFENG ; SHAO ZONGBING ; GONG MINGXIA ; LIU SHUZHI ; WANG ZENG'EN ; XING LE ; WANG XI ; HE TIANQI ; LIU ZHONGXING ; CHEN SHULI</creatorcontrib><description>The invention discloses a rapid construction method of a prefabricated segmental beam, and aims to solve the technical problems of a prefabricated segmental assembled bracket system with the height of8m or unbalanced load and a bracket body supporting technology in the construction of a ramp bridge with a smaller radius. The rapid construction method of the prefabricated segmental beam comprisesthe following steps that after a foundation is treated, performing measurement and positioning; arranging a disc buckle support; laying main ridges and secondary ridges, and placing jacks; carrying out a preloading test on the stent system; performing primary settlement observation on the prefabricated segmental beams before and after suspension splicing; after settlement stabilization, performingpermanent prestress strand pulling, tensioning and pressure drop of the top plate are conducted according to design; completing permanent prestress construction of the roof; after tensioning of the prestressed steel strands is</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20200818&DB=EPODOC&CC=CN&NR=111549678A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20200818&DB=EPODOC&CC=CN&NR=111549678A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHENG XINMING</creatorcontrib><creatorcontrib>WANG SHUAI</creatorcontrib><creatorcontrib>ZHAO ZHANYING</creatorcontrib><creatorcontrib>FAN RUILI</creatorcontrib><creatorcontrib>HUANG SHILONG</creatorcontrib><creatorcontrib>MA JIANAN</creatorcontrib><creatorcontrib>LI MING</creatorcontrib><creatorcontrib>QIU ZHI</creatorcontrib><creatorcontrib>SHI HONGTAO</creatorcontrib><creatorcontrib>XIE JIYI</creatorcontrib><creatorcontrib>WANG QIANQIAN</creatorcontrib><creatorcontrib>LI TAIBAI</creatorcontrib><creatorcontrib>FENG SHIKAI</creatorcontrib><creatorcontrib>ZHANG BANG</creatorcontrib><creatorcontrib>YAN HUAIFENG</creatorcontrib><creatorcontrib>SHAO ZONGBING</creatorcontrib><creatorcontrib>GONG MINGXIA</creatorcontrib><creatorcontrib>LIU SHUZHI</creatorcontrib><creatorcontrib>WANG ZENG'EN</creatorcontrib><creatorcontrib>XING LE</creatorcontrib><creatorcontrib>WANG XI</creatorcontrib><creatorcontrib>HE TIANQI</creatorcontrib><creatorcontrib>LIU ZHONGXING</creatorcontrib><creatorcontrib>CHEN SHULI</creatorcontrib><title>Rapid construction method of prefabricated segmental beam</title><description>The invention discloses a rapid construction method of a prefabricated segmental beam, and aims to solve the technical problems of a prefabricated segmental assembled bracket system with the height of8m or unbalanced load and a bracket body supporting technology in the construction of a ramp bridge with a smaller radius. The rapid construction method of the prefabricated segmental beam comprisesthe following steps that after a foundation is treated, performing measurement and positioning; arranging a disc buckle support; laying main ridges and secondary ridges, and placing jacks; carrying out a preloading test on the stent system; performing primary settlement observation on the prefabricated segmental beams before and after suspension splicing; after settlement stabilization, performingpermanent prestress strand pulling, tensioning and pressure drop of the top plate are conducted according to design; completing permanent prestress construction of the roof; after tensioning of the prestressed steel strands is</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLAMSizITFFIzs8rLikqTS7JzM9TyE0tychPUchPUygoSk1LTCrKTE4sSU1RKE5Nz03NK0nMUUhKTczlYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GhoamJpZm5haOxsSoAQBnUy8G</recordid><startdate>20200818</startdate><enddate>20200818</enddate><creator>ZHENG XINMING</creator><creator>WANG SHUAI</creator><creator>ZHAO ZHANYING</creator><creator>FAN RUILI</creator><creator>HUANG SHILONG</creator><creator>MA JIANAN</creator><creator>LI MING</creator><creator>QIU ZHI</creator><creator>SHI HONGTAO</creator><creator>XIE JIYI</creator><creator>WANG QIANQIAN</creator><creator>LI TAIBAI</creator><creator>FENG SHIKAI</creator><creator>ZHANG BANG</creator><creator>YAN HUAIFENG</creator><creator>SHAO ZONGBING</creator><creator>GONG MINGXIA</creator><creator>LIU SHUZHI</creator><creator>WANG ZENG'EN</creator><creator>XING LE</creator><creator>WANG XI</creator><creator>HE TIANQI</creator><creator>LIU ZHONGXING</creator><creator>CHEN SHULI</creator><scope>EVB</scope></search><sort><creationdate>20200818</creationdate><title>Rapid construction method of prefabricated segmental beam</title><author>ZHENG XINMING ; WANG SHUAI ; ZHAO ZHANYING ; FAN RUILI ; HUANG SHILONG ; MA JIANAN ; LI MING ; QIU ZHI ; SHI HONGTAO ; XIE JIYI ; WANG QIANQIAN ; LI TAIBAI ; FENG SHIKAI ; ZHANG BANG ; YAN HUAIFENG ; SHAO ZONGBING ; GONG MINGXIA ; LIU SHUZHI ; WANG ZENG'EN ; XING LE ; WANG XI ; HE TIANQI ; LIU ZHONGXING ; CHEN SHULI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN111549678A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2020</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHENG XINMING</creatorcontrib><creatorcontrib>WANG SHUAI</creatorcontrib><creatorcontrib>ZHAO ZHANYING</creatorcontrib><creatorcontrib>FAN RUILI</creatorcontrib><creatorcontrib>HUANG SHILONG</creatorcontrib><creatorcontrib>MA JIANAN</creatorcontrib><creatorcontrib>LI MING</creatorcontrib><creatorcontrib>QIU ZHI</creatorcontrib><creatorcontrib>SHI HONGTAO</creatorcontrib><creatorcontrib>XIE JIYI</creatorcontrib><creatorcontrib>WANG QIANQIAN</creatorcontrib><creatorcontrib>LI TAIBAI</creatorcontrib><creatorcontrib>FENG SHIKAI</creatorcontrib><creatorcontrib>ZHANG BANG</creatorcontrib><creatorcontrib>YAN HUAIFENG</creatorcontrib><creatorcontrib>SHAO ZONGBING</creatorcontrib><creatorcontrib>GONG MINGXIA</creatorcontrib><creatorcontrib>LIU SHUZHI</creatorcontrib><creatorcontrib>WANG ZENG'EN</creatorcontrib><creatorcontrib>XING LE</creatorcontrib><creatorcontrib>WANG XI</creatorcontrib><creatorcontrib>HE TIANQI</creatorcontrib><creatorcontrib>LIU ZHONGXING</creatorcontrib><creatorcontrib>CHEN SHULI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHENG XINMING</au><au>WANG SHUAI</au><au>ZHAO ZHANYING</au><au>FAN RUILI</au><au>HUANG SHILONG</au><au>MA JIANAN</au><au>LI MING</au><au>QIU ZHI</au><au>SHI HONGTAO</au><au>XIE JIYI</au><au>WANG QIANQIAN</au><au>LI TAIBAI</au><au>FENG SHIKAI</au><au>ZHANG BANG</au><au>YAN HUAIFENG</au><au>SHAO ZONGBING</au><au>GONG MINGXIA</au><au>LIU SHUZHI</au><au>WANG ZENG'EN</au><au>XING LE</au><au>WANG XI</au><au>HE TIANQI</au><au>LIU ZHONGXING</au><au>CHEN SHULI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Rapid construction method of prefabricated segmental beam</title><date>2020-08-18</date><risdate>2020</risdate><abstract>The invention discloses a rapid construction method of a prefabricated segmental beam, and aims to solve the technical problems of a prefabricated segmental assembled bracket system with the height of8m or unbalanced load and a bracket body supporting technology in the construction of a ramp bridge with a smaller radius. The rapid construction method of the prefabricated segmental beam comprisesthe following steps that after a foundation is treated, performing measurement and positioning; arranging a disc buckle support; laying main ridges and secondary ridges, and placing jacks; carrying out a preloading test on the stent system; performing primary settlement observation on the prefabricated segmental beams before and after suspension splicing; after settlement stabilization, performingpermanent prestress strand pulling, tensioning and pressure drop of the top plate are conducted according to design; completing permanent prestress construction of the roof; after tensioning of the prestressed steel strands is</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN111549678A |
source | esp@cenet |
subjects | ASSEMBLY OF BRIDGES CONSTRUCTION OF BRIDGES CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES FIXED CONSTRUCTIONS OR VIADUCTS |
title | Rapid construction method of prefabricated segmental beam |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-06T17%3A11%3A30IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHENG%20XINMING&rft.date=2020-08-18&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN111549678A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |