Rapid construction method of prefabricated segmental beam

The invention discloses a rapid construction method of a prefabricated segmental beam, and aims to solve the technical problems of a prefabricated segmental assembled bracket system with the height of8m or unbalanced load and a bracket body supporting technology in the construction of a ramp bridge...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHENG XINMING, WANG SHUAI, ZHAO ZHANYING, FAN RUILI, HUANG SHILONG, MA JIANAN, LI MING, QIU ZHI, SHI HONGTAO, XIE JIYI, WANG QIANQIAN, LI TAIBAI, FENG SHIKAI, ZHANG BANG, YAN HUAIFENG, SHAO ZONGBING, GONG MINGXIA, LIU SHUZHI, WANG ZENG'EN, XING LE, WANG XI, HE TIANQI, LIU ZHONGXING, CHEN SHULI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator ZHENG XINMING
WANG SHUAI
ZHAO ZHANYING
FAN RUILI
HUANG SHILONG
MA JIANAN
LI MING
QIU ZHI
SHI HONGTAO
XIE JIYI
WANG QIANQIAN
LI TAIBAI
FENG SHIKAI
ZHANG BANG
YAN HUAIFENG
SHAO ZONGBING
GONG MINGXIA
LIU SHUZHI
WANG ZENG'EN
XING LE
WANG XI
HE TIANQI
LIU ZHONGXING
CHEN SHULI
description The invention discloses a rapid construction method of a prefabricated segmental beam, and aims to solve the technical problems of a prefabricated segmental assembled bracket system with the height of8m or unbalanced load and a bracket body supporting technology in the construction of a ramp bridge with a smaller radius. The rapid construction method of the prefabricated segmental beam comprisesthe following steps that after a foundation is treated, performing measurement and positioning; arranging a disc buckle support; laying main ridges and secondary ridges, and placing jacks; carrying out a preloading test on the stent system; performing primary settlement observation on the prefabricated segmental beams before and after suspension splicing; after settlement stabilization, performingpermanent prestress strand pulling, tensioning and pressure drop of the top plate are conducted according to design; completing permanent prestress construction of the roof; after tensioning of the prestressed steel strands is
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN111549678A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN111549678A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN111549678A3</originalsourceid><addsrcrecordid>eNrjZLAMSizITFFIzs8rLikqTS7JzM9TyE0tychPUchPUygoSk1LTCrKTE4sSU1RKE5Nz03NK0nMUUhKTczlYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GhoamJpZm5haOxsSoAQBnUy8G</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Rapid construction method of prefabricated segmental beam</title><source>esp@cenet</source><creator>ZHENG XINMING ; WANG SHUAI ; ZHAO ZHANYING ; FAN RUILI ; HUANG SHILONG ; MA JIANAN ; LI MING ; QIU ZHI ; SHI HONGTAO ; XIE JIYI ; WANG QIANQIAN ; LI TAIBAI ; FENG SHIKAI ; ZHANG BANG ; YAN HUAIFENG ; SHAO ZONGBING ; GONG MINGXIA ; LIU SHUZHI ; WANG ZENG'EN ; XING LE ; WANG XI ; HE TIANQI ; LIU ZHONGXING ; CHEN SHULI</creator><creatorcontrib>ZHENG XINMING ; WANG SHUAI ; ZHAO ZHANYING ; FAN RUILI ; HUANG SHILONG ; MA JIANAN ; LI MING ; QIU ZHI ; SHI HONGTAO ; XIE JIYI ; WANG QIANQIAN ; LI TAIBAI ; FENG SHIKAI ; ZHANG BANG ; YAN HUAIFENG ; SHAO ZONGBING ; GONG MINGXIA ; LIU SHUZHI ; WANG ZENG'EN ; XING LE ; WANG XI ; HE TIANQI ; LIU ZHONGXING ; CHEN SHULI</creatorcontrib><description>The invention discloses a rapid construction method of a prefabricated segmental beam, and aims to solve the technical problems of a prefabricated segmental assembled bracket system with the height of8m or unbalanced load and a bracket body supporting technology in the construction of a ramp bridge with a smaller radius. The rapid construction method of the prefabricated segmental beam comprisesthe following steps that after a foundation is treated, performing measurement and positioning; arranging a disc buckle support; laying main ridges and secondary ridges, and placing jacks; carrying out a preloading test on the stent system; performing primary settlement observation on the prefabricated segmental beams before and after suspension splicing; after settlement stabilization, performingpermanent prestress strand pulling, tensioning and pressure drop of the top plate are conducted according to design; completing permanent prestress construction of the roof; after tensioning of the prestressed steel strands is</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20200818&amp;DB=EPODOC&amp;CC=CN&amp;NR=111549678A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20200818&amp;DB=EPODOC&amp;CC=CN&amp;NR=111549678A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHENG XINMING</creatorcontrib><creatorcontrib>WANG SHUAI</creatorcontrib><creatorcontrib>ZHAO ZHANYING</creatorcontrib><creatorcontrib>FAN RUILI</creatorcontrib><creatorcontrib>HUANG SHILONG</creatorcontrib><creatorcontrib>MA JIANAN</creatorcontrib><creatorcontrib>LI MING</creatorcontrib><creatorcontrib>QIU ZHI</creatorcontrib><creatorcontrib>SHI HONGTAO</creatorcontrib><creatorcontrib>XIE JIYI</creatorcontrib><creatorcontrib>WANG QIANQIAN</creatorcontrib><creatorcontrib>LI TAIBAI</creatorcontrib><creatorcontrib>FENG SHIKAI</creatorcontrib><creatorcontrib>ZHANG BANG</creatorcontrib><creatorcontrib>YAN HUAIFENG</creatorcontrib><creatorcontrib>SHAO ZONGBING</creatorcontrib><creatorcontrib>GONG MINGXIA</creatorcontrib><creatorcontrib>LIU SHUZHI</creatorcontrib><creatorcontrib>WANG ZENG'EN</creatorcontrib><creatorcontrib>XING LE</creatorcontrib><creatorcontrib>WANG XI</creatorcontrib><creatorcontrib>HE TIANQI</creatorcontrib><creatorcontrib>LIU ZHONGXING</creatorcontrib><creatorcontrib>CHEN SHULI</creatorcontrib><title>Rapid construction method of prefabricated segmental beam</title><description>The invention discloses a rapid construction method of a prefabricated segmental beam, and aims to solve the technical problems of a prefabricated segmental assembled bracket system with the height of8m or unbalanced load and a bracket body supporting technology in the construction of a ramp bridge with a smaller radius. The rapid construction method of the prefabricated segmental beam comprisesthe following steps that after a foundation is treated, performing measurement and positioning; arranging a disc buckle support; laying main ridges and secondary ridges, and placing jacks; carrying out a preloading test on the stent system; performing primary settlement observation on the prefabricated segmental beams before and after suspension splicing; after settlement stabilization, performingpermanent prestress strand pulling, tensioning and pressure drop of the top plate are conducted according to design; completing permanent prestress construction of the roof; after tensioning of the prestressed steel strands is</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLAMSizITFFIzs8rLikqTS7JzM9TyE0tychPUchPUygoSk1LTCrKTE4sSU1RKE5Nz03NK0nMUUhKTczlYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GhoamJpZm5haOxsSoAQBnUy8G</recordid><startdate>20200818</startdate><enddate>20200818</enddate><creator>ZHENG XINMING</creator><creator>WANG SHUAI</creator><creator>ZHAO ZHANYING</creator><creator>FAN RUILI</creator><creator>HUANG SHILONG</creator><creator>MA JIANAN</creator><creator>LI MING</creator><creator>QIU ZHI</creator><creator>SHI HONGTAO</creator><creator>XIE JIYI</creator><creator>WANG QIANQIAN</creator><creator>LI TAIBAI</creator><creator>FENG SHIKAI</creator><creator>ZHANG BANG</creator><creator>YAN HUAIFENG</creator><creator>SHAO ZONGBING</creator><creator>GONG MINGXIA</creator><creator>LIU SHUZHI</creator><creator>WANG ZENG'EN</creator><creator>XING LE</creator><creator>WANG XI</creator><creator>HE TIANQI</creator><creator>LIU ZHONGXING</creator><creator>CHEN SHULI</creator><scope>EVB</scope></search><sort><creationdate>20200818</creationdate><title>Rapid construction method of prefabricated segmental beam</title><author>ZHENG XINMING ; WANG SHUAI ; ZHAO ZHANYING ; FAN RUILI ; HUANG SHILONG ; MA JIANAN ; LI MING ; QIU ZHI ; SHI HONGTAO ; XIE JIYI ; WANG QIANQIAN ; LI TAIBAI ; FENG SHIKAI ; ZHANG BANG ; YAN HUAIFENG ; SHAO ZONGBING ; GONG MINGXIA ; LIU SHUZHI ; WANG ZENG'EN ; XING LE ; WANG XI ; HE TIANQI ; LIU ZHONGXING ; CHEN SHULI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN111549678A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2020</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHENG XINMING</creatorcontrib><creatorcontrib>WANG SHUAI</creatorcontrib><creatorcontrib>ZHAO ZHANYING</creatorcontrib><creatorcontrib>FAN RUILI</creatorcontrib><creatorcontrib>HUANG SHILONG</creatorcontrib><creatorcontrib>MA JIANAN</creatorcontrib><creatorcontrib>LI MING</creatorcontrib><creatorcontrib>QIU ZHI</creatorcontrib><creatorcontrib>SHI HONGTAO</creatorcontrib><creatorcontrib>XIE JIYI</creatorcontrib><creatorcontrib>WANG QIANQIAN</creatorcontrib><creatorcontrib>LI TAIBAI</creatorcontrib><creatorcontrib>FENG SHIKAI</creatorcontrib><creatorcontrib>ZHANG BANG</creatorcontrib><creatorcontrib>YAN HUAIFENG</creatorcontrib><creatorcontrib>SHAO ZONGBING</creatorcontrib><creatorcontrib>GONG MINGXIA</creatorcontrib><creatorcontrib>LIU SHUZHI</creatorcontrib><creatorcontrib>WANG ZENG'EN</creatorcontrib><creatorcontrib>XING LE</creatorcontrib><creatorcontrib>WANG XI</creatorcontrib><creatorcontrib>HE TIANQI</creatorcontrib><creatorcontrib>LIU ZHONGXING</creatorcontrib><creatorcontrib>CHEN SHULI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHENG XINMING</au><au>WANG SHUAI</au><au>ZHAO ZHANYING</au><au>FAN RUILI</au><au>HUANG SHILONG</au><au>MA JIANAN</au><au>LI MING</au><au>QIU ZHI</au><au>SHI HONGTAO</au><au>XIE JIYI</au><au>WANG QIANQIAN</au><au>LI TAIBAI</au><au>FENG SHIKAI</au><au>ZHANG BANG</au><au>YAN HUAIFENG</au><au>SHAO ZONGBING</au><au>GONG MINGXIA</au><au>LIU SHUZHI</au><au>WANG ZENG'EN</au><au>XING LE</au><au>WANG XI</au><au>HE TIANQI</au><au>LIU ZHONGXING</au><au>CHEN SHULI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Rapid construction method of prefabricated segmental beam</title><date>2020-08-18</date><risdate>2020</risdate><abstract>The invention discloses a rapid construction method of a prefabricated segmental beam, and aims to solve the technical problems of a prefabricated segmental assembled bracket system with the height of8m or unbalanced load and a bracket body supporting technology in the construction of a ramp bridge with a smaller radius. The rapid construction method of the prefabricated segmental beam comprisesthe following steps that after a foundation is treated, performing measurement and positioning; arranging a disc buckle support; laying main ridges and secondary ridges, and placing jacks; carrying out a preloading test on the stent system; performing primary settlement observation on the prefabricated segmental beams before and after suspension splicing; after settlement stabilization, performingpermanent prestress strand pulling, tensioning and pressure drop of the top plate are conducted according to design; completing permanent prestress construction of the roof; after tensioning of the prestressed steel strands is</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN111549678A
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
OR VIADUCTS
title Rapid construction method of prefabricated segmental beam
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-06T17%3A11%3A30IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHENG%20XINMING&rft.date=2020-08-18&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN111549678A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true