Rapid construction method of prefabricated segmental beam

The invention discloses a rapid construction method of a prefabricated segmental beam, and aims to solve the technical problems of a prefabricated segmental assembled bracket system with the height of8m or unbalanced load and a bracket body supporting technology in the construction of a ramp bridge...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHENG XINMING, WANG SHUAI, ZHAO ZHANYING, FAN RUILI, HUANG SHILONG, MA JIANAN, LI MING, QIU ZHI, SHI HONGTAO, XIE JIYI, WANG QIANQIAN, LI TAIBAI, FENG SHIKAI, ZHANG BANG, YAN HUAIFENG, SHAO ZONGBING, GONG MINGXIA, LIU SHUZHI, WANG ZENG'EN, XING LE, WANG XI, HE TIANQI, LIU ZHONGXING, CHEN SHULI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a rapid construction method of a prefabricated segmental beam, and aims to solve the technical problems of a prefabricated segmental assembled bracket system with the height of8m or unbalanced load and a bracket body supporting technology in the construction of a ramp bridge with a smaller radius. The rapid construction method of the prefabricated segmental beam comprisesthe following steps that after a foundation is treated, performing measurement and positioning; arranging a disc buckle support; laying main ridges and secondary ridges, and placing jacks; carrying out a preloading test on the stent system; performing primary settlement observation on the prefabricated segmental beams before and after suspension splicing; after settlement stabilization, performingpermanent prestress strand pulling, tensioning and pressure drop of the top plate are conducted according to design; completing permanent prestress construction of the roof; after tensioning of the prestressed steel strands is