Closure method for mid-span steel box girders of large-span floating system cable-stayed bridge

The invention discloses a closure method for mid-span steel box girders of a large-span floating system cable-stayed bridge. The closure method comprises the following steps: temporary longitudinal bridge direction limiting is conducted on steel box girder sections at a main tower; the mid-span stee...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: YANG WENMING, LI YONG, CHEN ZHANG, ZHANG JING, JIN HONGYAN, XIE HONGYUE, WANG YINFENG, HU JUN, QI YA, LUO HANG, HU HAIBO, LIU JIANHUA, FU XIAOPENG, ZHAO QUANCHENG, MING HONGBING
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator YANG WENMING
LI YONG
CHEN ZHANG
ZHANG JING
JIN HONGYAN
XIE HONGYUE
WANG YINFENG
HU JUN
QI YA
LUO HANG
HU HAIBO
LIU JIANHUA
FU XIAOPENG
ZHAO QUANCHENG
MING HONGBING
description The invention discloses a closure method for mid-span steel box girders of a large-span floating system cable-stayed bridge. The closure method comprises the following steps: temporary longitudinal bridge direction limiting is conducted on steel box girder sections at a main tower; the mid-span steel box girders are assembled by a cantilever; the mid-span steel box girders on the two sides of a closure opening are monitored, and a closure section steel box girder is manufactured according to the monitoring result; the temporary longitudinal bridge direction limit is released, the mid-span steel box girders in the direction away are moved from the closure gap, and first temporary locking is carried out; the closure section steel box girder is hoisted; the first temporary locking is released, the mid-span steel box girders are moved towards the closure gap to be reset, and second temporary locking is carried out; the relative postures of the closure section steel box girder and the mid-span steel box girders ar
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN111519536A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN111519536A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN111519536A3</originalsourceid><addsrcrecordid>eNqNjLEKwjAURbs4iPoPzw_oEEoFRwkVJyf3kjY3MfCaV5II9u8t6Ac4neEczrbqNUt-JdCE8hRLThJNwdZ5NpFyAZgGeZMPySJlEkdsksfXOxZTQvSUlzWdaDQDr6qYBZaGFKzHvto4wxmHH3fV8do99K3GLD3Wy4iI0uu7UqpV57Y5XZp_mg9WlDyt</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Closure method for mid-span steel box girders of large-span floating system cable-stayed bridge</title><source>esp@cenet</source><creator>YANG WENMING ; LI YONG ; CHEN ZHANG ; ZHANG JING ; JIN HONGYAN ; XIE HONGYUE ; WANG YINFENG ; HU JUN ; QI YA ; LUO HANG ; HU HAIBO ; LIU JIANHUA ; FU XIAOPENG ; ZHAO QUANCHENG ; MING HONGBING</creator><creatorcontrib>YANG WENMING ; LI YONG ; CHEN ZHANG ; ZHANG JING ; JIN HONGYAN ; XIE HONGYUE ; WANG YINFENG ; HU JUN ; QI YA ; LUO HANG ; HU HAIBO ; LIU JIANHUA ; FU XIAOPENG ; ZHAO QUANCHENG ; MING HONGBING</creatorcontrib><description>The invention discloses a closure method for mid-span steel box girders of a large-span floating system cable-stayed bridge. The closure method comprises the following steps: temporary longitudinal bridge direction limiting is conducted on steel box girder sections at a main tower; the mid-span steel box girders are assembled by a cantilever; the mid-span steel box girders on the two sides of a closure opening are monitored, and a closure section steel box girder is manufactured according to the monitoring result; the temporary longitudinal bridge direction limit is released, the mid-span steel box girders in the direction away are moved from the closure gap, and first temporary locking is carried out; the closure section steel box girder is hoisted; the first temporary locking is released, the mid-span steel box girders are moved towards the closure gap to be reset, and second temporary locking is carried out; the relative postures of the closure section steel box girder and the mid-span steel box girders ar</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20200811&amp;DB=EPODOC&amp;CC=CN&amp;NR=111519536A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20200811&amp;DB=EPODOC&amp;CC=CN&amp;NR=111519536A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>YANG WENMING</creatorcontrib><creatorcontrib>LI YONG</creatorcontrib><creatorcontrib>CHEN ZHANG</creatorcontrib><creatorcontrib>ZHANG JING</creatorcontrib><creatorcontrib>JIN HONGYAN</creatorcontrib><creatorcontrib>XIE HONGYUE</creatorcontrib><creatorcontrib>WANG YINFENG</creatorcontrib><creatorcontrib>HU JUN</creatorcontrib><creatorcontrib>QI YA</creatorcontrib><creatorcontrib>LUO HANG</creatorcontrib><creatorcontrib>HU HAIBO</creatorcontrib><creatorcontrib>LIU JIANHUA</creatorcontrib><creatorcontrib>FU XIAOPENG</creatorcontrib><creatorcontrib>ZHAO QUANCHENG</creatorcontrib><creatorcontrib>MING HONGBING</creatorcontrib><title>Closure method for mid-span steel box girders of large-span floating system cable-stayed bridge</title><description>The invention discloses a closure method for mid-span steel box girders of a large-span floating system cable-stayed bridge. The closure method comprises the following steps: temporary longitudinal bridge direction limiting is conducted on steel box girder sections at a main tower; the mid-span steel box girders are assembled by a cantilever; the mid-span steel box girders on the two sides of a closure opening are monitored, and a closure section steel box girder is manufactured according to the monitoring result; the temporary longitudinal bridge direction limit is released, the mid-span steel box girders in the direction away are moved from the closure gap, and first temporary locking is carried out; the closure section steel box girder is hoisted; the first temporary locking is released, the mid-span steel box girders are moved towards the closure gap to be reset, and second temporary locking is carried out; the relative postures of the closure section steel box girder and the mid-span steel box girders ar</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjLEKwjAURbs4iPoPzw_oEEoFRwkVJyf3kjY3MfCaV5II9u8t6Ac4neEczrbqNUt-JdCE8hRLThJNwdZ5NpFyAZgGeZMPySJlEkdsksfXOxZTQvSUlzWdaDQDr6qYBZaGFKzHvto4wxmHH3fV8do99K3GLD3Wy4iI0uu7UqpV57Y5XZp_mg9WlDyt</recordid><startdate>20200811</startdate><enddate>20200811</enddate><creator>YANG WENMING</creator><creator>LI YONG</creator><creator>CHEN ZHANG</creator><creator>ZHANG JING</creator><creator>JIN HONGYAN</creator><creator>XIE HONGYUE</creator><creator>WANG YINFENG</creator><creator>HU JUN</creator><creator>QI YA</creator><creator>LUO HANG</creator><creator>HU HAIBO</creator><creator>LIU JIANHUA</creator><creator>FU XIAOPENG</creator><creator>ZHAO QUANCHENG</creator><creator>MING HONGBING</creator><scope>EVB</scope></search><sort><creationdate>20200811</creationdate><title>Closure method for mid-span steel box girders of large-span floating system cable-stayed bridge</title><author>YANG WENMING ; LI YONG ; CHEN ZHANG ; ZHANG JING ; JIN HONGYAN ; XIE HONGYUE ; WANG YINFENG ; HU JUN ; QI YA ; LUO HANG ; HU HAIBO ; LIU JIANHUA ; FU XIAOPENG ; ZHAO QUANCHENG ; MING HONGBING</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN111519536A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2020</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>YANG WENMING</creatorcontrib><creatorcontrib>LI YONG</creatorcontrib><creatorcontrib>CHEN ZHANG</creatorcontrib><creatorcontrib>ZHANG JING</creatorcontrib><creatorcontrib>JIN HONGYAN</creatorcontrib><creatorcontrib>XIE HONGYUE</creatorcontrib><creatorcontrib>WANG YINFENG</creatorcontrib><creatorcontrib>HU JUN</creatorcontrib><creatorcontrib>QI YA</creatorcontrib><creatorcontrib>LUO HANG</creatorcontrib><creatorcontrib>HU HAIBO</creatorcontrib><creatorcontrib>LIU JIANHUA</creatorcontrib><creatorcontrib>FU XIAOPENG</creatorcontrib><creatorcontrib>ZHAO QUANCHENG</creatorcontrib><creatorcontrib>MING HONGBING</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>YANG WENMING</au><au>LI YONG</au><au>CHEN ZHANG</au><au>ZHANG JING</au><au>JIN HONGYAN</au><au>XIE HONGYUE</au><au>WANG YINFENG</au><au>HU JUN</au><au>QI YA</au><au>LUO HANG</au><au>HU HAIBO</au><au>LIU JIANHUA</au><au>FU XIAOPENG</au><au>ZHAO QUANCHENG</au><au>MING HONGBING</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Closure method for mid-span steel box girders of large-span floating system cable-stayed bridge</title><date>2020-08-11</date><risdate>2020</risdate><abstract>The invention discloses a closure method for mid-span steel box girders of a large-span floating system cable-stayed bridge. The closure method comprises the following steps: temporary longitudinal bridge direction limiting is conducted on steel box girder sections at a main tower; the mid-span steel box girders are assembled by a cantilever; the mid-span steel box girders on the two sides of a closure opening are monitored, and a closure section steel box girder is manufactured according to the monitoring result; the temporary longitudinal bridge direction limit is released, the mid-span steel box girders in the direction away are moved from the closure gap, and first temporary locking is carried out; the closure section steel box girder is hoisted; the first temporary locking is released, the mid-span steel box girders are moved towards the closure gap to be reset, and second temporary locking is carried out; the relative postures of the closure section steel box girder and the mid-span steel box girders ar</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN111519536A
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
OR VIADUCTS
title Closure method for mid-span steel box girders of large-span floating system cable-stayed bridge
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-29T01%3A06%3A32IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=YANG%20WENMING&rft.date=2020-08-11&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN111519536A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true