Closure method for mid-span steel box girders of large-span floating system cable-stayed bridge
The invention discloses a closure method for mid-span steel box girders of a large-span floating system cable-stayed bridge. The closure method comprises the following steps: temporary longitudinal bridge direction limiting is conducted on steel box girder sections at a main tower; the mid-span stee...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | YANG WENMING LI YONG CHEN ZHANG ZHANG JING JIN HONGYAN XIE HONGYUE WANG YINFENG HU JUN QI YA LUO HANG HU HAIBO LIU JIANHUA FU XIAOPENG ZHAO QUANCHENG MING HONGBING |
description | The invention discloses a closure method for mid-span steel box girders of a large-span floating system cable-stayed bridge. The closure method comprises the following steps: temporary longitudinal bridge direction limiting is conducted on steel box girder sections at a main tower; the mid-span steel box girders are assembled by a cantilever; the mid-span steel box girders on the two sides of a closure opening are monitored, and a closure section steel box girder is manufactured according to the monitoring result; the temporary longitudinal bridge direction limit is released, the mid-span steel box girders in the direction away are moved from the closure gap, and first temporary locking is carried out; the closure section steel box girder is hoisted; the first temporary locking is released, the mid-span steel box girders are moved towards the closure gap to be reset, and second temporary locking is carried out; the relative postures of the closure section steel box girder and the mid-span steel box girders ar |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN111519536A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN111519536A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN111519536A3</originalsourceid><addsrcrecordid>eNqNjLEKwjAURbs4iPoPzw_oEEoFRwkVJyf3kjY3MfCaV5II9u8t6Ac4neEczrbqNUt-JdCE8hRLThJNwdZ5NpFyAZgGeZMPySJlEkdsksfXOxZTQvSUlzWdaDQDr6qYBZaGFKzHvto4wxmHH3fV8do99K3GLD3Wy4iI0uu7UqpV57Y5XZp_mg9WlDyt</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Closure method for mid-span steel box girders of large-span floating system cable-stayed bridge</title><source>esp@cenet</source><creator>YANG WENMING ; LI YONG ; CHEN ZHANG ; ZHANG JING ; JIN HONGYAN ; XIE HONGYUE ; WANG YINFENG ; HU JUN ; QI YA ; LUO HANG ; HU HAIBO ; LIU JIANHUA ; FU XIAOPENG ; ZHAO QUANCHENG ; MING HONGBING</creator><creatorcontrib>YANG WENMING ; LI YONG ; CHEN ZHANG ; ZHANG JING ; JIN HONGYAN ; XIE HONGYUE ; WANG YINFENG ; HU JUN ; QI YA ; LUO HANG ; HU HAIBO ; LIU JIANHUA ; FU XIAOPENG ; ZHAO QUANCHENG ; MING HONGBING</creatorcontrib><description>The invention discloses a closure method for mid-span steel box girders of a large-span floating system cable-stayed bridge. The closure method comprises the following steps: temporary longitudinal bridge direction limiting is conducted on steel box girder sections at a main tower; the mid-span steel box girders are assembled by a cantilever; the mid-span steel box girders on the two sides of a closure opening are monitored, and a closure section steel box girder is manufactured according to the monitoring result; the temporary longitudinal bridge direction limit is released, the mid-span steel box girders in the direction away are moved from the closure gap, and first temporary locking is carried out; the closure section steel box girder is hoisted; the first temporary locking is released, the mid-span steel box girders are moved towards the closure gap to be reset, and second temporary locking is carried out; the relative postures of the closure section steel box girder and the mid-span steel box girders ar</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20200811&DB=EPODOC&CC=CN&NR=111519536A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20200811&DB=EPODOC&CC=CN&NR=111519536A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>YANG WENMING</creatorcontrib><creatorcontrib>LI YONG</creatorcontrib><creatorcontrib>CHEN ZHANG</creatorcontrib><creatorcontrib>ZHANG JING</creatorcontrib><creatorcontrib>JIN HONGYAN</creatorcontrib><creatorcontrib>XIE HONGYUE</creatorcontrib><creatorcontrib>WANG YINFENG</creatorcontrib><creatorcontrib>HU JUN</creatorcontrib><creatorcontrib>QI YA</creatorcontrib><creatorcontrib>LUO HANG</creatorcontrib><creatorcontrib>HU HAIBO</creatorcontrib><creatorcontrib>LIU JIANHUA</creatorcontrib><creatorcontrib>FU XIAOPENG</creatorcontrib><creatorcontrib>ZHAO QUANCHENG</creatorcontrib><creatorcontrib>MING HONGBING</creatorcontrib><title>Closure method for mid-span steel box girders of large-span floating system cable-stayed bridge</title><description>The invention discloses a closure method for mid-span steel box girders of a large-span floating system cable-stayed bridge. The closure method comprises the following steps: temporary longitudinal bridge direction limiting is conducted on steel box girder sections at a main tower; the mid-span steel box girders are assembled by a cantilever; the mid-span steel box girders on the two sides of a closure opening are monitored, and a closure section steel box girder is manufactured according to the monitoring result; the temporary longitudinal bridge direction limit is released, the mid-span steel box girders in the direction away are moved from the closure gap, and first temporary locking is carried out; the closure section steel box girder is hoisted; the first temporary locking is released, the mid-span steel box girders are moved towards the closure gap to be reset, and second temporary locking is carried out; the relative postures of the closure section steel box girder and the mid-span steel box girders ar</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjLEKwjAURbs4iPoPzw_oEEoFRwkVJyf3kjY3MfCaV5II9u8t6Ac4neEczrbqNUt-JdCE8hRLThJNwdZ5NpFyAZgGeZMPySJlEkdsksfXOxZTQvSUlzWdaDQDr6qYBZaGFKzHvto4wxmHH3fV8do99K3GLD3Wy4iI0uu7UqpV57Y5XZp_mg9WlDyt</recordid><startdate>20200811</startdate><enddate>20200811</enddate><creator>YANG WENMING</creator><creator>LI YONG</creator><creator>CHEN ZHANG</creator><creator>ZHANG JING</creator><creator>JIN HONGYAN</creator><creator>XIE HONGYUE</creator><creator>WANG YINFENG</creator><creator>HU JUN</creator><creator>QI YA</creator><creator>LUO HANG</creator><creator>HU HAIBO</creator><creator>LIU JIANHUA</creator><creator>FU XIAOPENG</creator><creator>ZHAO QUANCHENG</creator><creator>MING HONGBING</creator><scope>EVB</scope></search><sort><creationdate>20200811</creationdate><title>Closure method for mid-span steel box girders of large-span floating system cable-stayed bridge</title><author>YANG WENMING ; LI YONG ; CHEN ZHANG ; ZHANG JING ; JIN HONGYAN ; XIE HONGYUE ; WANG YINFENG ; HU JUN ; QI YA ; LUO HANG ; HU HAIBO ; LIU JIANHUA ; FU XIAOPENG ; ZHAO QUANCHENG ; MING HONGBING</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN111519536A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2020</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>YANG WENMING</creatorcontrib><creatorcontrib>LI YONG</creatorcontrib><creatorcontrib>CHEN ZHANG</creatorcontrib><creatorcontrib>ZHANG JING</creatorcontrib><creatorcontrib>JIN HONGYAN</creatorcontrib><creatorcontrib>XIE HONGYUE</creatorcontrib><creatorcontrib>WANG YINFENG</creatorcontrib><creatorcontrib>HU JUN</creatorcontrib><creatorcontrib>QI YA</creatorcontrib><creatorcontrib>LUO HANG</creatorcontrib><creatorcontrib>HU HAIBO</creatorcontrib><creatorcontrib>LIU JIANHUA</creatorcontrib><creatorcontrib>FU XIAOPENG</creatorcontrib><creatorcontrib>ZHAO QUANCHENG</creatorcontrib><creatorcontrib>MING HONGBING</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>YANG WENMING</au><au>LI YONG</au><au>CHEN ZHANG</au><au>ZHANG JING</au><au>JIN HONGYAN</au><au>XIE HONGYUE</au><au>WANG YINFENG</au><au>HU JUN</au><au>QI YA</au><au>LUO HANG</au><au>HU HAIBO</au><au>LIU JIANHUA</au><au>FU XIAOPENG</au><au>ZHAO QUANCHENG</au><au>MING HONGBING</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Closure method for mid-span steel box girders of large-span floating system cable-stayed bridge</title><date>2020-08-11</date><risdate>2020</risdate><abstract>The invention discloses a closure method for mid-span steel box girders of a large-span floating system cable-stayed bridge. The closure method comprises the following steps: temporary longitudinal bridge direction limiting is conducted on steel box girder sections at a main tower; the mid-span steel box girders are assembled by a cantilever; the mid-span steel box girders on the two sides of a closure opening are monitored, and a closure section steel box girder is manufactured according to the monitoring result; the temporary longitudinal bridge direction limit is released, the mid-span steel box girders in the direction away are moved from the closure gap, and first temporary locking is carried out; the closure section steel box girder is hoisted; the first temporary locking is released, the mid-span steel box girders are moved towards the closure gap to be reset, and second temporary locking is carried out; the relative postures of the closure section steel box girder and the mid-span steel box girders ar</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN111519536A |
source | esp@cenet |
subjects | ASSEMBLY OF BRIDGES CONSTRUCTION OF BRIDGES CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES FIXED CONSTRUCTIONS OR VIADUCTS |
title | Closure method for mid-span steel box girders of large-span floating system cable-stayed bridge |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-29T01%3A06%3A32IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=YANG%20WENMING&rft.date=2020-08-11&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN111519536A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |