Closure method for mid-span steel box girders of large-span floating system cable-stayed bridge

The invention discloses a closure method for mid-span steel box girders of a large-span floating system cable-stayed bridge. The closure method comprises the following steps: temporary longitudinal bridge direction limiting is conducted on steel box girder sections at a main tower; the mid-span stee...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: YANG WENMING, LI YONG, CHEN ZHANG, ZHANG JING, JIN HONGYAN, XIE HONGYUE, WANG YINFENG, HU JUN, QI YA, LUO HANG, HU HAIBO, LIU JIANHUA, FU XIAOPENG, ZHAO QUANCHENG, MING HONGBING
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a closure method for mid-span steel box girders of a large-span floating system cable-stayed bridge. The closure method comprises the following steps: temporary longitudinal bridge direction limiting is conducted on steel box girder sections at a main tower; the mid-span steel box girders are assembled by a cantilever; the mid-span steel box girders on the two sides of a closure opening are monitored, and a closure section steel box girder is manufactured according to the monitoring result; the temporary longitudinal bridge direction limit is released, the mid-span steel box girders in the direction away are moved from the closure gap, and first temporary locking is carried out; the closure section steel box girder is hoisted; the first temporary locking is released, the mid-span steel box girders are moved towards the closure gap to be reset, and second temporary locking is carried out; the relative postures of the closure section steel box girder and the mid-span steel box girders ar