Mounting process of approach bridge broken line section prefabricated part

The invention provides a mounting process of an approach bridge broken line section prefabricated part. The process comprises the steps that an approach bridge is divided into a deep water area, a mudflat area and a mangrove forest area, broken line sections are located in the mangrove forest area,...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LIU WEI, KANG XIANGLONG, QI YOUBAO, FANG JIANCHUN, DU LIN, LI ZELONG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator LIU WEI
KANG XIANGLONG
QI YOUBAO
FANG JIANCHUN
DU LIN
LI ZELONG
description The invention provides a mounting process of an approach bridge broken line section prefabricated part. The process comprises the steps that an approach bridge is divided into a deep water area, a mudflat area and a mangrove forest area, broken line sections are located in the mangrove forest area, prefabricated parts are installed in the deep water area through a flat crane ship, and prefabricated parts are installed in the mudflat area and the mangrove forest area in a one-way propelling mode from the sea side to the land side through a bridge erecting machine; and prefabricated beam platesin the mudflat area and the mangrove forest area are hoisted, the prefabricated parts are hoisted from a beam transporting barge to a beam transporting flatcar by using a flat crane ship, the beam transporting flatcar transports the prefabricated parts to the position of a bridge girder erection machine through a rail installed on the approach bridge, and the bridge girder erection machine carriesout broken line section p
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN111485498A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN111485498A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN111485498A3</originalsourceid><addsrcrecordid>eNqNirEKAjEQBdNYiPoP6wdYBE84SzkUEbSyP9bcy13w2A1J_H9T-AFWwzCzNLe7fqQEGSkmdciZ1BPHKuwmeqUwjKjQN4TmIKAMV4JK3eG5dscFA0VOZW0WnueMzY8rs72cn911h6g9cmQHQem7h7W2aQ_NsT3t_3m-Q981ZA</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Mounting process of approach bridge broken line section prefabricated part</title><source>esp@cenet</source><creator>LIU WEI ; KANG XIANGLONG ; QI YOUBAO ; FANG JIANCHUN ; DU LIN ; LI ZELONG</creator><creatorcontrib>LIU WEI ; KANG XIANGLONG ; QI YOUBAO ; FANG JIANCHUN ; DU LIN ; LI ZELONG</creatorcontrib><description>The invention provides a mounting process of an approach bridge broken line section prefabricated part. The process comprises the steps that an approach bridge is divided into a deep water area, a mudflat area and a mangrove forest area, broken line sections are located in the mangrove forest area, prefabricated parts are installed in the deep water area through a flat crane ship, and prefabricated parts are installed in the mudflat area and the mangrove forest area in a one-way propelling mode from the sea side to the land side through a bridge erecting machine; and prefabricated beam platesin the mudflat area and the mangrove forest area are hoisted, the prefabricated parts are hoisted from a beam transporting barge to a beam transporting flatcar by using a flat crane ship, the beam transporting flatcar transports the prefabricated parts to the position of a bridge girder erection machine through a rail installed on the approach bridge, and the bridge girder erection machine carriesout broken line section p</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20200804&amp;DB=EPODOC&amp;CC=CN&amp;NR=111485498A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20200804&amp;DB=EPODOC&amp;CC=CN&amp;NR=111485498A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LIU WEI</creatorcontrib><creatorcontrib>KANG XIANGLONG</creatorcontrib><creatorcontrib>QI YOUBAO</creatorcontrib><creatorcontrib>FANG JIANCHUN</creatorcontrib><creatorcontrib>DU LIN</creatorcontrib><creatorcontrib>LI ZELONG</creatorcontrib><title>Mounting process of approach bridge broken line section prefabricated part</title><description>The invention provides a mounting process of an approach bridge broken line section prefabricated part. The process comprises the steps that an approach bridge is divided into a deep water area, a mudflat area and a mangrove forest area, broken line sections are located in the mangrove forest area, prefabricated parts are installed in the deep water area through a flat crane ship, and prefabricated parts are installed in the mudflat area and the mangrove forest area in a one-way propelling mode from the sea side to the land side through a bridge erecting machine; and prefabricated beam platesin the mudflat area and the mangrove forest area are hoisted, the prefabricated parts are hoisted from a beam transporting barge to a beam transporting flatcar by using a flat crane ship, the beam transporting flatcar transports the prefabricated parts to the position of a bridge girder erection machine through a rail installed on the approach bridge, and the bridge girder erection machine carriesout broken line section p</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNirEKAjEQBdNYiPoP6wdYBE84SzkUEbSyP9bcy13w2A1J_H9T-AFWwzCzNLe7fqQEGSkmdciZ1BPHKuwmeqUwjKjQN4TmIKAMV4JK3eG5dscFA0VOZW0WnueMzY8rs72cn911h6g9cmQHQem7h7W2aQ_NsT3t_3m-Q981ZA</recordid><startdate>20200804</startdate><enddate>20200804</enddate><creator>LIU WEI</creator><creator>KANG XIANGLONG</creator><creator>QI YOUBAO</creator><creator>FANG JIANCHUN</creator><creator>DU LIN</creator><creator>LI ZELONG</creator><scope>EVB</scope></search><sort><creationdate>20200804</creationdate><title>Mounting process of approach bridge broken line section prefabricated part</title><author>LIU WEI ; KANG XIANGLONG ; QI YOUBAO ; FANG JIANCHUN ; DU LIN ; LI ZELONG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN111485498A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2020</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>LIU WEI</creatorcontrib><creatorcontrib>KANG XIANGLONG</creatorcontrib><creatorcontrib>QI YOUBAO</creatorcontrib><creatorcontrib>FANG JIANCHUN</creatorcontrib><creatorcontrib>DU LIN</creatorcontrib><creatorcontrib>LI ZELONG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LIU WEI</au><au>KANG XIANGLONG</au><au>QI YOUBAO</au><au>FANG JIANCHUN</au><au>DU LIN</au><au>LI ZELONG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Mounting process of approach bridge broken line section prefabricated part</title><date>2020-08-04</date><risdate>2020</risdate><abstract>The invention provides a mounting process of an approach bridge broken line section prefabricated part. The process comprises the steps that an approach bridge is divided into a deep water area, a mudflat area and a mangrove forest area, broken line sections are located in the mangrove forest area, prefabricated parts are installed in the deep water area through a flat crane ship, and prefabricated parts are installed in the mudflat area and the mangrove forest area in a one-way propelling mode from the sea side to the land side through a bridge erecting machine; and prefabricated beam platesin the mudflat area and the mangrove forest area are hoisted, the prefabricated parts are hoisted from a beam transporting barge to a beam transporting flatcar by using a flat crane ship, the beam transporting flatcar transports the prefabricated parts to the position of a bridge girder erection machine through a rail installed on the approach bridge, and the bridge girder erection machine carriesout broken line section p</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN111485498A
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
OR VIADUCTS
title Mounting process of approach bridge broken line section prefabricated part
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-25T19%3A22%3A40IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LIU%20WEI&rft.date=2020-08-04&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN111485498A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true