Mounting process of approach bridge broken line section prefabricated part
The invention provides a mounting process of an approach bridge broken line section prefabricated part. The process comprises the steps that an approach bridge is divided into a deep water area, a mudflat area and a mangrove forest area, broken line sections are located in the mangrove forest area,...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | LIU WEI KANG XIANGLONG QI YOUBAO FANG JIANCHUN DU LIN LI ZELONG |
description | The invention provides a mounting process of an approach bridge broken line section prefabricated part. The process comprises the steps that an approach bridge is divided into a deep water area, a mudflat area and a mangrove forest area, broken line sections are located in the mangrove forest area, prefabricated parts are installed in the deep water area through a flat crane ship, and prefabricated parts are installed in the mudflat area and the mangrove forest area in a one-way propelling mode from the sea side to the land side through a bridge erecting machine; and prefabricated beam platesin the mudflat area and the mangrove forest area are hoisted, the prefabricated parts are hoisted from a beam transporting barge to a beam transporting flatcar by using a flat crane ship, the beam transporting flatcar transports the prefabricated parts to the position of a bridge girder erection machine through a rail installed on the approach bridge, and the bridge girder erection machine carriesout broken line section p |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN111485498A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN111485498A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN111485498A3</originalsourceid><addsrcrecordid>eNqNirEKAjEQBdNYiPoP6wdYBE84SzkUEbSyP9bcy13w2A1J_H9T-AFWwzCzNLe7fqQEGSkmdciZ1BPHKuwmeqUwjKjQN4TmIKAMV4JK3eG5dscFA0VOZW0WnueMzY8rs72cn911h6g9cmQHQem7h7W2aQ_NsT3t_3m-Q981ZA</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Mounting process of approach bridge broken line section prefabricated part</title><source>esp@cenet</source><creator>LIU WEI ; KANG XIANGLONG ; QI YOUBAO ; FANG JIANCHUN ; DU LIN ; LI ZELONG</creator><creatorcontrib>LIU WEI ; KANG XIANGLONG ; QI YOUBAO ; FANG JIANCHUN ; DU LIN ; LI ZELONG</creatorcontrib><description>The invention provides a mounting process of an approach bridge broken line section prefabricated part. The process comprises the steps that an approach bridge is divided into a deep water area, a mudflat area and a mangrove forest area, broken line sections are located in the mangrove forest area, prefabricated parts are installed in the deep water area through a flat crane ship, and prefabricated parts are installed in the mudflat area and the mangrove forest area in a one-way propelling mode from the sea side to the land side through a bridge erecting machine; and prefabricated beam platesin the mudflat area and the mangrove forest area are hoisted, the prefabricated parts are hoisted from a beam transporting barge to a beam transporting flatcar by using a flat crane ship, the beam transporting flatcar transports the prefabricated parts to the position of a bridge girder erection machine through a rail installed on the approach bridge, and the bridge girder erection machine carriesout broken line section p</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20200804&DB=EPODOC&CC=CN&NR=111485498A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20200804&DB=EPODOC&CC=CN&NR=111485498A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LIU WEI</creatorcontrib><creatorcontrib>KANG XIANGLONG</creatorcontrib><creatorcontrib>QI YOUBAO</creatorcontrib><creatorcontrib>FANG JIANCHUN</creatorcontrib><creatorcontrib>DU LIN</creatorcontrib><creatorcontrib>LI ZELONG</creatorcontrib><title>Mounting process of approach bridge broken line section prefabricated part</title><description>The invention provides a mounting process of an approach bridge broken line section prefabricated part. The process comprises the steps that an approach bridge is divided into a deep water area, a mudflat area and a mangrove forest area, broken line sections are located in the mangrove forest area, prefabricated parts are installed in the deep water area through a flat crane ship, and prefabricated parts are installed in the mudflat area and the mangrove forest area in a one-way propelling mode from the sea side to the land side through a bridge erecting machine; and prefabricated beam platesin the mudflat area and the mangrove forest area are hoisted, the prefabricated parts are hoisted from a beam transporting barge to a beam transporting flatcar by using a flat crane ship, the beam transporting flatcar transports the prefabricated parts to the position of a bridge girder erection machine through a rail installed on the approach bridge, and the bridge girder erection machine carriesout broken line section p</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNirEKAjEQBdNYiPoP6wdYBE84SzkUEbSyP9bcy13w2A1J_H9T-AFWwzCzNLe7fqQEGSkmdciZ1BPHKuwmeqUwjKjQN4TmIKAMV4JK3eG5dscFA0VOZW0WnueMzY8rs72cn911h6g9cmQHQem7h7W2aQ_NsT3t_3m-Q981ZA</recordid><startdate>20200804</startdate><enddate>20200804</enddate><creator>LIU WEI</creator><creator>KANG XIANGLONG</creator><creator>QI YOUBAO</creator><creator>FANG JIANCHUN</creator><creator>DU LIN</creator><creator>LI ZELONG</creator><scope>EVB</scope></search><sort><creationdate>20200804</creationdate><title>Mounting process of approach bridge broken line section prefabricated part</title><author>LIU WEI ; KANG XIANGLONG ; QI YOUBAO ; FANG JIANCHUN ; DU LIN ; LI ZELONG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN111485498A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2020</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>LIU WEI</creatorcontrib><creatorcontrib>KANG XIANGLONG</creatorcontrib><creatorcontrib>QI YOUBAO</creatorcontrib><creatorcontrib>FANG JIANCHUN</creatorcontrib><creatorcontrib>DU LIN</creatorcontrib><creatorcontrib>LI ZELONG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LIU WEI</au><au>KANG XIANGLONG</au><au>QI YOUBAO</au><au>FANG JIANCHUN</au><au>DU LIN</au><au>LI ZELONG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Mounting process of approach bridge broken line section prefabricated part</title><date>2020-08-04</date><risdate>2020</risdate><abstract>The invention provides a mounting process of an approach bridge broken line section prefabricated part. The process comprises the steps that an approach bridge is divided into a deep water area, a mudflat area and a mangrove forest area, broken line sections are located in the mangrove forest area, prefabricated parts are installed in the deep water area through a flat crane ship, and prefabricated parts are installed in the mudflat area and the mangrove forest area in a one-way propelling mode from the sea side to the land side through a bridge erecting machine; and prefabricated beam platesin the mudflat area and the mangrove forest area are hoisted, the prefabricated parts are hoisted from a beam transporting barge to a beam transporting flatcar by using a flat crane ship, the beam transporting flatcar transports the prefabricated parts to the position of a bridge girder erection machine through a rail installed on the approach bridge, and the bridge girder erection machine carriesout broken line section p</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN111485498A |
source | esp@cenet |
subjects | ASSEMBLY OF BRIDGES CONSTRUCTION OF BRIDGES CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES FIXED CONSTRUCTIONS OR VIADUCTS |
title | Mounting process of approach bridge broken line section prefabricated part |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-25T19%3A22%3A40IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LIU%20WEI&rft.date=2020-08-04&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN111485498A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |