Mounting process of approach bridge broken line section prefabricated part
The invention provides a mounting process of an approach bridge broken line section prefabricated part. The process comprises the steps that an approach bridge is divided into a deep water area, a mudflat area and a mangrove forest area, broken line sections are located in the mangrove forest area,...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention provides a mounting process of an approach bridge broken line section prefabricated part. The process comprises the steps that an approach bridge is divided into a deep water area, a mudflat area and a mangrove forest area, broken line sections are located in the mangrove forest area, prefabricated parts are installed in the deep water area through a flat crane ship, and prefabricated parts are installed in the mudflat area and the mangrove forest area in a one-way propelling mode from the sea side to the land side through a bridge erecting machine; and prefabricated beam platesin the mudflat area and the mangrove forest area are hoisted, the prefabricated parts are hoisted from a beam transporting barge to a beam transporting flatcar by using a flat crane ship, the beam transporting flatcar transports the prefabricated parts to the position of a bridge girder erection machine through a rail installed on the approach bridge, and the bridge girder erection machine carriesout broken line section p |
---|