Method for improving geophysical prospecting electric sounding field construction efficiency

The invention provides a method for improving geophysical prospecting electric sounding field construction efficiency, which comprises the following steps of laying sounding points and making an electrode distance table, and respectively arranging a power supply electrode and a receiving electrode d...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: QU WEIGUI, LIU JUNYUAN, WANG FEI, ZHAO ZHENHUA, XU RULEI, DANG WEIMIN, YU DA, CAI YUNSHENG, YANG YUANDONG, BAO JIURONG, LIU JIANQUAN, LIU SHIGANG, LI SONGBIN, KONG XIANGDONG, XING YINSUO, WANG JIANQING, LIU ZHANPENG, YUAN TING
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention provides a method for improving geophysical prospecting electric sounding field construction efficiency, which comprises the following steps of laying sounding points and making an electrode distance table, and respectively arranging a power supply electrode and a receiving electrode distance at two sides of the measuring point along the section direction according to the values of the power supply electrode distance AB/2 and the receiving electrode distance MN/2 in the electrode distance table until the measurement work of all the measuring points is completed. Only one-time arrangement of a large electrode distance, i.e., a power supply and receiving electrode distance with a power supply electrode distance AB/2 greater than 65m, needs to be completed; cyclic rolling measurement is carried out on a section according to a designed electrode distance table; compared with an original method for completing all measuring points, the electrode distribution moving distance isreduced, in the AB distri