Coal mine main ventilator switching method

The invention discloses a coal mine main ventilator switching method. The coal mine main ventilator switching method comprises the following steps that a test hole is formed in the side wall of an airduct on the air inlet side of each of a main ventilator A and a main ventilator B, the sizes of the...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: LIAN HONGFEI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a coal mine main ventilator switching method. The coal mine main ventilator switching method comprises the following steps that a test hole is formed in the side wall of an airduct on the air inlet side of each of a main ventilator A and a main ventilator B, the sizes of the test holes are adjusted according to the equivalent orifice principle, and the mine ventilation working condition is simulated. When the main ventilator A needs to be switched to the main ventilator B during normal operation, the main ventilator B is started in advance and operates for 30 minutes under the rated working condition, the technical parameters of all devices of a system B are detected, and after no problem exists, a test air door of the system B is closed, an air inlet door of the system B is opened, and mutual switching of the two main ventilators is completed. 一种煤矿主通风机切换方法,包括:分别在A、B两台主通风机进风侧的风筒侧壁上各开一个测试孔,根据等积孔原理,调节测试孔大小,模拟矿井通风工况。在A主通风机正常运行需切换至B主通风机时,提前启动B主通风机,并在额定工况下运行30分钟,检测B系统各设备的技术参数,无问题后,对B系统关闭测试风